I have a question, I visit 01 site and face a problem,
there is 2.5 ton Air Con working, when air con compressor
is running at that time rectifier voltages are increasing
upto 290-295 v and rectifier is giving main high alarm
(rectifier is APC single phase, before starting compressor
rectifier voltages was 230v. when air con is going off
rectifier voltages are decreasing smoothly at its actual
voltages 230v.
Load on Genset phases is this: Red-13.5 amp AC (Air Con
load), Yellow-1.7 amp AC (BTS lights etc.) and Blew-4 amp
AC (telecom system load),
Genset phase to phase and neutral to phase voltages are
also ok.
These are 10 sites having same system and same rectifier
APC brand at every site 02 genset are working but the
problem is same at all these 10 sites.
What will be the reason behind???
what is pf. how to calculate capacitor bank value to maintain unity pf.
18 Answers JH, Saint Gobain, Supreme Treves,
How to calculate the CFM to TR? What is the Formula
1.What is the proper definition of power system stability? 2.some times a blue spark is visible in the secondary side of a distribution transformer at the contact position of bushings and fuse wire,why?
We have a 12MW power plant & we inject 5-6MW power to Orissa GRID. For this we have a 33KV/11KV switch yard having 12.5MVA power transformer. Some times we draw power during emergency. It is observed that during Export or Import for load less than 500Kw the power factor is decreasing to 0.3 . This is happening only during export or import. During island condition TG power factor OK.Our capacitor bank is provided with our Power plant auxilliary load. Please suggest how I can we improve our power factor during low load (GRID).
why are maintine power factor 0.99 in Eb line? why are used capacitor bank in Eb line? what is the purpose capacitor bank?
4 Answers TNEB Tamil Nadu Electricity Board,
why power factor is lagging and leading(i.e -1to +1)
How to calculat the ratio of HT\LT in energy meter
What is the diffrece between ACB & MCCB
A mass of 1200g is accelerated at 200 cm/s2by a force. The value of the force required is:(a) 2.4N(b) 2400N(c) 240 kN(d) 0.24N
Starting Time of LT & HT Motor
Between AC generator(alternator) and DC generator which can be designed for high voltage and why?
how to calculate the cable size in sqmm if load (kw) is given?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)