1.how to calculate the nails qty in shuttering of column,beam, shear wall.
2.how control the binding wire wastage in building project.
3.
Answer Posted / ratheesh
.750grms to 1Kg nails for 1sqm shuttering.
u can use single binding wires
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
Describe a time when you anticipated potential problems and developed Preventive measures
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
What are the techniques to measure road difference?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
Use of coping on terrace wall and in 4" wall is compulsory or not ?
How does a traffic light signal work ?
What is the withdrawal force of steel nails?
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
What is pre-stressed concrete?
pls tell me about method of cutting length of ties column
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
How do you convert wind speed into force?
which type of instrument included in plumbing work?name of instrument?