How do you calculate load bearing capacity of a waffle slab?
No Answer is Posted For this Question
Be the First to Post Answer
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
What is Architect-Prepared Contract?
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
how much area can be platered by a mason for exterior
What is the lap length in your project?
11 Answers L&T, Practical Viva Questions,
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
sir, i used 43grade opc cement to my wall plastering,i have cured 20 days ,recently , white dots and white powder shades are appearing on walls, is it any defect by curing excess days? have any disadvantages by it ? please answer
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
0 Answers Civil Service, Intelinet, Marg, PMC,
Any strength is a stress but any stress is not strength
how to calculate number of bitumen for road asphalt
How to calculate the steel for 392c.meter*450c.meter rcc slab
how much to get of BRC lapping in full yield and half yield ?