we are roofing contractors,we are filling a bill in work
contract 4.12% method, we collecting 4.12% from our customer
but every month we have been paying the vat at 2% from our
pocket on the total value of bill. our auditor told me the
above method do not collect 2% from the customer side is it
true?
Answer Posted / visal
No
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
What is the material consumption- cement,sand,tiles etc for Toilet dado?
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
What is the outturn of Ceiling plastering
How much material will consume for following specification water tank (9*7.5*6 feet)?
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?
it is possiblee to produce concrete with out cracks...
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
What is c.g.i sheet which used for roof??