we are roofing contractors,we are filling a bill in work
contract 4.12% method, we collecting 4.12% from our customer
but every month we have been paying the vat at 2% from our
pocket on the total value of bill. our auditor told me the
above method do not collect 2% from the customer side is it
true?
Answer Posted / visal
No
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to find quantity of concrete in PCC M15
How to calculate plastering for elevated water storage tank
what is the theoritical percentage of concrete cubes testing per day?
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
Explain what are the skills required to become an architect?
How do you prepare Material Recovery Statement for deduction from contractors bills?
how gradation of aggregates effect on slump of fresh concrete?
What is the development length given in pile?
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
from where ican get sample papers for CET-delhi 2012
What are the advantages of building a dam on the river nile?
Why should you show Client/Engineer activities clearly on the project plan?
types of piles detail,
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'