In a beam,stirrups are placed closely at ends than at centre
due to shear.similarly where would ties be closer to each
other-at center or at ends in a column and slab.
No Answer is Posted For this Question
Be the First to Post Answer
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
what is the meaning of W.T.S this is written on structural Drawing
How long does it take concrete to harden?
In the roof of a pumping station explain briefly the components of a waterproofing system?
If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).
how to calclate the cemment for 1 cubic metre of 1:2:4 concrete
what is the meaning of morth
Explain creep?
List out the densities of different construction materials such as brick, steel, sand, aggregate etc...
what is periode of deshuttering of slab our span length 21m,and width 2.5m grade of concrete M-35
How to calculate cement required for m20,m5 grade
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)