Advantages and Disadvantages of using fly ash bricks over
clay bricks?

Answers were Sorted based on User's Feedback



Advantages and Disadvantages of using fly ash bricks over clay bricks?..

Answer / saurabh agarwal

Use of fly ash bricks is dangerous bocause of the following reasons:-
1. smoth surface doesnot stick plaster properly
2. brick when cut by machine for electric pipes, it transform into pieces
3. not a water absorber. a good and tough building needs plenty of water.
4. not so much difference in cost it we compaire it with good clay brick
5. sudden dammage in the wall will leads to a big hole.
i am saying which i felt while using this brick

If there is anyone who is using this brick will be facing this problems.

Is This Answer Correct ?    19 Yes 42 No

Post New Answer

More Civil Engineering Interview Questions

how i can tak Quantity of mortar in block work

0 Answers   DLF, LiveCon,


What is the difference between Stress & Strain?

2 Answers   NCC,


give me an example of a time when you had to explain some new procedures to your co-workers for quality service delivery, how did you go about it?

0 Answers  


How does a traffic light signal work ?

0 Answers   KCP,


What is the best mixture ratio in building a power plant? what is the weight of a 1 sack cement? what is the density of a cement?

1 Answers   Alfaraa, CMC,






what is E <MOE> VALUE FOR WOOD

0 Answers  


what values & beliefs have guided you in your career path

0 Answers   IVRCL,


can any one tell me how to estimate the reforcement of circular slab and also for dome.

1 Answers  


Gidc technical que paper

0 Answers   GIDC,


what is the difference between highway and motorway?

0 Answers  


what is the use of bottom reinforcement in Cantilever Beam?

4 Answers   McNally,


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)