Answer / antaratara ghosh

Line PT is connected in the incomer (line) to detect the
voltage of the incomer whereas bus PT is connected in the
bus, 1 before the bus coupler and another after bus
coupler, to detect voltage in the bus.

The main purpose of both of them is to sense the voltage so
that the breaker can get enough information to operate..

Is This Answer Correct ?    52 Yes 1 No

What is the difference in Line PT & Bus PT...

Answer / maloy

line pt is connected in incomer where the bus pt is connectd in the main bus bar though both funtioning the same for measurement & protection

Is This Answer Correct ?    17 Yes 0 No

What is the difference in Line PT & Bus PT...

Answer / muhammad abid ali shah

Line PT is used to measured the voltage and also used for voltage protection means that under voltage or over voltage and the bus PT is used for metering and measure the voltage of bus bar voltage.

Is This Answer Correct ?    4 Yes 7 No

Post New Answer

More Electrical Engineering Interview Questions

C.S.R. and where are they use in electrical systems

1 Answers  


where the lexical paramater will use in fron end?

0 Answers  


when the direction of a 3phase induction motor is reversed , is there any losses increases?

5 Answers   IOCL,


how will calculate the winding ohmic value in 3phase motors in h.p wise? ex.10 h.p motor winding value ph to ph ? 5 h.p motor any calculation please send me.

1 Answers   Hyundai,


what is ph test in coolent cheking

2 Answers  






What is gain margin?

0 Answers  


Please mention available current rating for MCB,RCCB,MCCB in the market or any website

1 Answers   ETCO,


what will happen when reverse reactive power occurs in alternators?

3 Answers   Reliance,


What are the reasons for the parallel operation of transformers?

0 Answers  


How to design CT for connected with Transformer OLTC operation? normally CT output design for 1A/5A range but during OLTC Tap position changing time how to function the CT?

1 Answers   HEG,


can we ran equipment up to 10kw between phase to grounding/ earthing. beside above can we use grounding instead of neutral. .

1 Answers   TNEB Tamil Nadu Electricity Board,


what is the per unit cost of generation of electricity at thermal,hydro,desael,solar,gas power plant

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)