Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why we do not get the electric shock at end of returning
water of water cooled cable



why we do not get the electric shock at end of returning water of water cooled cable..

Answer / wareagle

Because you have a defective water cooler or a defect in
the electrical system. Call electrician before someone is
Electrocuted

Is This Answer Correct ?    1 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

What is pi controller?

0 Answers  


how to calaculate the amps in transformer ?

2 Answers  


Why earthing is required for diesel tank?

4 Answers   Greaves,


For a DY11 lighting Transformer on primary side whee to connect fourth lead? from nuetral or from ground?

3 Answers   Sabic,


What is the difference between AC Drive and VFD?

10 Answers   ITC Infotech,


armature is that part in which current is induced since in dc motor we supply current to the conductor so why we call it armature?

0 Answers  


What is the difference between AC and DC injection methods for rotor earth fault protection

0 Answers   Asian Alliance Insurance, NBVL,


Is there any capacitor in 3-phase IM?why,xplain.

2 Answers  


What is NUMBER OF RUN for power cable means?

4 Answers  


how the speed decreases of a generator in power station if load increases

1 Answers   Tata Power,


After synchronization with grid what is the demand value QKVAR and how we will maintain that?

0 Answers  


Transformer rating=> 15/20 MVA.Why there are two raings? What should be the rating of the fuse at the secondary if the voltage level is 13.8KV/4.16KV?

1 Answers   Bhel,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)