Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


our scope called one core cable for distribution system so we
like to use 4 core cable with one equipment grounding
conductor so what kind of technical reasons i can say that the
4core is better then 1 core,

Answers were Sorted based on User's Feedback



our scope called one core cable for distribution system so we like to use 4 core cable with one eq..

Answer / kasi

for normally 1 core cable has more losses when it carries
current than 4 core cable and also it is economical.

Is This Answer Correct ?    1 Yes 0 No

our scope called one core cable for distribution system so we like to use 4 core cable with one eq..

Answer / wareagle

Did you check the price?

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

What is the GI Earth Flat Size recomended for 33KV 2000KVA Distribution Transformer

1 Answers  


how we can calculate LT side current of transformer

2 Answers   L&T,


What is Phase to Phase clearance for 800V System Operating Voltage as per IEC61439

0 Answers  


1.Why use in ups in software's,reason,and pls explain. 2.what is the isolation transformer and main use it's functioning and partes.

5 Answers   TATA, Wipro,


how a vibration switch's high signal will going to trip the motor? can u explain with some examplesand wiring diagrams?

1 Answers   Bhel, Wartsila,


Give me the calculation steps to design an electromagnet to be work in 230V 50 Hz AC Supply. Also give force that is created by that electromagnet when it gets energized.

0 Answers   GE,


What is the Diesel consumption between 82KVA DG Set and 180KVA DG Set for 1 hour.

1 Answers  


Why only mesh earthing is used in G.S.S.?

2 Answers  


why the frequency and voltage in india is 230v and 50HZ. when compared to USA say 110v and 60 HZ.

0 Answers   Alstom,


what is power factor? whether it should be high or low? why?

11 Answers  


selection of conductor in different voltage?

1 Answers   TATA,


When is lag lead compensator is required?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)