Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


in one substation we have two power transformers of
100mva,75mva capacity.statoin load is155mva.how much each
tranformers share the load????

Answers were Sorted based on User's Feedback



in one substation we have two power transformers of 100mva,75mva capacity.statoin load is155mva...

Answer / tara shankar gupta

Any system desined is to optimam utilisation,here we have
to Xmr ie 100 MVA and 75 MVA, connected load is 155 MVA in
this case we cant optimize 75 MVA Xmr. in such situations i
will suggest Maximam loading of Big Xme and Load rest MVA
to smaller one.

Is This Answer Correct ?    5 Yes 0 No

in one substation we have two power transformers of 100mva,75mva capacity.statoin load is155mva...

Answer / asm

first you have to confirm that 155MVA is connected or
diversified load, if it is connected load then 90% loading
is coming. however if it is diversified load then u can
load upto 80% of transformer capacity. in this case X'mer
will be out of higher efficiency range.

Is This Answer Correct ?    3 Yes 0 No

in one substation we have two power transformers of 100mva,75mva capacity.statoin load is155mva...

Answer / santhosh

both the transformer is same rating it would be share equal
load,i.e (trafo1=2000kva,trafo2=2000kva),current load is
2200kva, now trafo1=1100,trafo2=1100

Is This Answer Correct ?    4 Yes 1 No

in one substation we have two power transformers of 100mva,75mva capacity.statoin load is155mva...

Answer / k.prakashchandra

The voltage drops in the transformers + line should be equal
at the secondary bus-bar. Current shared by tr1 x its %
impedance = load shared by tr2 x its % impedance.Hence The
load sharing ratio is inverse to ratio of % impedances.

Is This Answer Correct ?    1 Yes 0 No

in one substation we have two power transformers of 100mva,75mva capacity.statoin load is155mva...

Answer / k.prakashchandra

The load sharing will be in the inverse ratio of percentage
impedances. Lower the % impedance higher the load ,so that
the voltage drops are equal. .

Is This Answer Correct ?    0 Yes 0 No

in one substation we have two power transformers of 100mva,75mva capacity.statoin load is155mva...

Answer / harry

Higher Value Transformer u can Load upto 90% say 90MVA &
Lower Value Transformer u can load Load the Rest Say
remaining 10MVA.
It is General Practice to Do the Distribution of Load
According to above said manner

Is This Answer Correct ?    1 Yes 8 No

Post New Answer

More Electrical Engineering Interview Questions

how to calculate the magnetizing current of ct ( 800A/1A) for Relay 64

0 Answers   Cadsys,


what reactive how to maintain

0 Answers  


how we can know which is Lv side and HV side of transformer by just seeing it?

7 Answers  


How is the speed of a DC shunt motor related to the armature current?

0 Answers   GE,


what is difference between 2 pole structure and 4 pole structure in transformer yard

0 Answers   Hospira,


Why the earth cable have current 1A - 2A , it is safety for Electrical system or earth cable should be zero amps ? how to troubleshoot?

0 Answers  


How the earth fault relay works please explain?????????

2 Answers  


Sir, I completed DEEE... And now I working in TNEB for one year apprenticeship. If I eligible for applying c license and how can I get?

1 Answers  


11kv has three live wires how much voltage is in its single wire(leaving the other two wires)

13 Answers   Power Grid,


1)Explain why the cradle guard is used on railway crossing in overhead line construction?

0 Answers  


What is mean by CT Saturate? how do we calculate?

5 Answers   ABC,


I need to calculate the Battery bank back up for below configuration:- UPS - 120 KVA Battery Bank - 200Ah Volt of each cell - 12 V Total No of cell - 34 No's Can you please help me to get the battery back up time for above configuration...? along with formula

1 Answers   Wipro,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)