advantage and dis adventagesof using crusher dust insted of
sand in rcc works

Answers were Sorted based on User's Feedback



advantage and dis adventagesof using crusher dust insted of sand in rcc works..

Answer / guest

the main and only advantage of using this is just to use the
waste material in a specific manner.

Is This Answer Correct ?    4 Yes 0 No

advantage and dis adventagesof using crusher dust insted of sand in rcc works..

Answer / guest

Advantages :-
1.Crusher dust is used primarily as filler and cement aggregate.
2. When used in concrete, the crusher dust mixes in with larger aggregate to help form a specific texture.
3.Crusher dust can be used for many of your compacting jobs around the home, such as: paths, carparks, under slabs, filling trenches, under water tanks, etc.

Is This Answer Correct ?    4 Yes 0 No

advantage and dis adventagesof using crusher dust insted of sand in rcc works..

Answer / sha

there is no advantages using dust insted of sand..

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Volume of 25kg putty bag & 40 kg putty bag volume??

0 Answers   NCCL,


How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton

0 Answers  


Define what is quality...

4 Answers  


Differentiate first angle & third angle projection?

0 Answers  


a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.

0 Answers   Sail,






plz.show development and anchorage length in simple diagram.

0 Answers  


can i get hindi version of is codes based on civil engineering?

0 Answers   Cosmos, H Reck Engineers,


I had a plot of say 5000 sq.ft. and soil in the plot is normal soil. Now I had to work upon the tender quantities to prepare a preliminary budget within a day. Is there any thumb rule or assumptions to calculate the quantities which can differ upto 15% +/-?

2 Answers  


Defination of civil engineering

6 Answers  


insted of bentonite we can use any alternate material in piling ?

0 Answers  


how much % of steel use in footing, slab, column

18 Answers   Bhel, Matrix,


How can we find out the clear cover for a circular ring and rectangular ring..

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)