19. Are you a team player?
Answers were Sorted based on User's Feedback
Answer / guest
Of course to get tasks in the military completed you have
to work with all keeps of different people and they all
have a part to do. Be positive with everyone and the job
will get done.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / niranjani
Ya sure i m a team player. I will co-operate very well with
everyone in everywhere.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / manikandan v.s.
yes, I am a Team Player. I will be Completing the team soon
after joining your Company
Is This Answer Correct ? | 0 Yes | 0 No |
curing of concrete why 7day's,14day's 21day's 28days
What are the different softwares used for cad?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
1)define the critical items in rcc framed G+18 bldg. as Cr Activity 1,Cr Activity 2,Cr Activity 3...etc. 2)on what logic is MSP and Primavera planning based.FS SF FF...
How many stones require for 1200 Sq ft house
whaat is blister in box girder bridge and what is its function..
What is the ratio of cement ,sand, and aggregate to be used in M20 grade of concrete when excavating 200 x 200 x 200 mm of sand from soil
Target strength = fck +(1.65*4) What is this 4
The concrete slump recommended for beams and slabs; is?
what is called the inverd level of mabhole chamber?
Difference between lateral ties and stirrups?
How you Confirm the Hard stratum for Driven cat in situ Pile work?