which test comes first installation testing or
compatiability testing
Answers were Sorted based on User's Feedback
Answer / swathi bommavaram
hi pinky, this is swathi.
please check my answer, the question is posted by me.
if my answer is wrong send your answer to this email
my email id: swati_1225@yahoo.com
installation testing means checking whether the application
is properly installed or not at the client's environment.
this duty done by installation engineers not by test
engineers with the help of installation guideliness.
this installation is commmon either for a product or project
but, compatiability definatly done by test engineers for
product(s) only. compatiability means checking whether the
application is suitable or not for all environments.
if it is a project according to the client requirements we
just check in a particular environment.
compatiability done at company with the help of
installation guide lines, if that installation guide lines
are correct then we can apply same guidelines at client's
location also to install the application
| Is This Answer Correct ? | 21 Yes | 1 No |
Answer / pinky
compatability test bc its the part of functional testing
which is checked with lost versins and installation is
after the testing complets before going to check with
client it is done with the environment settings as per
customers environment
| Is This Answer Correct ? | 8 Yes | 5 No |
Answer / simpy
Compatibility testing is a part of system
testing.Installation is not a testing its work or task or
SDLC phase that we have to perform after acceptance testing
at the customer's place, when product will stable(means bug
free).Bcz in compatibility testing we will install our
product on different environment to check wether its is
stable or not..(i.e nothing but a installation testing).
I hope ..i m right.if wrong then post a comment..
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / dhiraj
hey friends,
u r talking about compatibility testing i dont have any
abjection in that but u talk about installation i have some
suggetion on ur answer
here answer is installation testing not installation and
maintance stat
before we send to client side for installation tester
must have to done installation testing
if any question mail on dhirajpatil4656@gmail.com
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / kaushik
Hi friends,
The question is about the installation testing and compatibility testing...the answer is simple
Installation testing :- Its just to verify the application is completely installed and all the required file has been extracted and the software will at least 2 option 1 is recommend and 2 is standard so tester will verify these functionality as well.....
Compatibility testing is nothing but testing the same application in different platform, if its a web based then different browsers....
If i am wrong please correct me Thank u
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / mahendra
compatabily testing,in this test engineer validates that
whether our application build runs on costomer expected
platform or not?
installation testing,in this tester has to observe
.setup program execution to start installation
.easy interface during installation
.occupied disk space after installation
compatabilt testing comes first
| Is This Answer Correct ? | 0 Yes | 2 No |
Who will repare SRS? What is the basis for SRS preparation?
If developers team doesn't agree with the bug raised by you, what is the next step would you take
What exactly you do as a Configuration controller?
What is software review?
contents of test plan
What is Standalone testing?
Hello Frnds Could U plz tell me What r the contents present in TEST DIRECTOR(According to the Interview) ???
what are the various bug reports that u publish
What is the purpose of test plan in your project?
is traceability matrix prepared by jr tester or sr tester or test lead?
Hi, I am Nithi. I have completed my MCA in 2005i am heving 2.2 yrs of experience in testing because of my daughter i got break during mar 2006 to dec 2007.now i joined in a small s/w company as tester.and i am looking for MNc job.what are all the things i want to prepare thanks in advance pls help me
Work flow in testing in your company?