what are the disadvantages og v-model over waterfall model?
Answer / sateesh
Compare to V-model with Water fall model...
Water fall model gives a
rigid application,
Re-work will be more cotlier and time taking,
Doing the changes once you build the product is not a easy
process,
Testing starts at the final stage(once product fully
developped)
where in V-Model
testing starts at early stage,
tester will get thourgh knowledge about the
product ,because they will be involved from the starting
phase of building the product,
Chances of getting less bugs,
Deliverables are parallel,
Re-work is easy to manage, you will have control over the
product.
| Is This Answer Correct ? | 6 Yes | 0 No |
Testing of Non-Functional requirements does not involove a) Performance tests b) Reliability tests c) usability tests d) Configuration tests
What is bug, deffect, issue, error?
Architectural structure of the insurance project?
What is Low level design & High level design? and brief description.
Diff B/w Test Strategy and test plan
1.register as candidate 2.go to skill set module 3.select any skill for test eg:"java" 4.save, page will open with start button on below 5.click on start button to start test for java this is a flow so do i need write test cases for this if yes,then how? plz help me guyss
What Tester should do after getting Requirement Doc?
What's the difference between alpha and beta testing?
write test case for gmail sign up page ?
Can anyone please explain me abt the IVR speech Testing,iam having an interview on that,what type of questions to be answered?
Write functional,system,integration,penetration,load,performance negative test cases for Instant messenger
what i s SRS
18 Answers Accenture, BPR, CLG,