what is the real de-shuttering time for rcc column,slaband
wall
Answer Posted / ravi kant sharma
Minimum 16 to 18hr for column for any grade of r.c.c.
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
What is the release of lien?
What is zoning permit?
Doul Bar reinforcement and details of drawing.
how much tempareture are required to make liquid state of pid leed
Why should appointment store person for project ? what is the benefits for company ?
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
What are segregation and bleeding?
Describe the role of independent Quantity surveyor?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
Which is the direction for positive angle?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
Define What are the reasons for geotechnical site investigations in Uganda?
The largest size of paper used in plotter to print the drawing made by Autocad .
Define block?