Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the real de-shuttering time for rcc column,slaband
wall

Answer Posted / royalcivil

the de-shuttering time for the slab is 21 days must.
for the column it should be minimum of 1 week

Is This Answer Correct ?    10 Yes 26 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.

2695


How does a traffic light signal work ?

2289


. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.

2487


what post do you prefer to work in this company and why do you think you can serve better in such position?

2813


procedure for preliminary selection of size of column of 5 storey building

3202


For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.

2136


Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted

1720


What is aggregate?

1120


what is the formula for Mass of cement grout (Dg)=???

2205


How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?

2078


what is the design procedure for building

2302


I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.

2338


for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete

1928


Explain what is change order request?

1124


Please tell me vasthu room sizes. Thanks.

2227