what is the real de-shuttering time for rcc column,slaband
wall
Answer Posted / royalcivil
the de-shuttering time for the slab is 21 days must.
for the column it should be minimum of 1 week
| Is This Answer Correct ? | 10 Yes | 26 No |
Post New Answer View All Answers
How to check slab shuttering level.? Or check list for slab ?
Calculation of Pier Cap with tapper area?
What is the l/d ratio of cantilever beam?
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
as per is code, what is the minimum content of opc and ppc cement for rcc structure
What are segregation and bleeding?
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
What is zoning permit?
List out the types of roofs?
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.
what is flashing?
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...