Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Can we use 11kv Trivector Metre or Energy metre instead
33kv Metre at 33kv Over Head Line metering purpose?

Answers were Sorted based on User's Feedback



Can we use 11kv Trivector Metre or Energy metre instead 33kv Metre at 33kv Over Head Line metering..

Answer / k.prakashchandra

The voltage input to almost all energy meters is 110 V line
to line ,which is the secondary voltage of PTs. You can use
them for all system voltages by applying the correct MF .

Is This Answer Correct ?    4 Yes 1 No

Can we use 11kv Trivector Metre or Energy metre instead 33kv Metre at 33kv Over Head Line metering..

Answer / mu

we can use any meter at this point as we have to only
change CT & PT's before commissioning,
I have used 11kv meter in 33 kv installation with similar
changes, usual practice done by SEB's across india when
supply voltage changes for any project.

Is This Answer Correct ?    3 Yes 1 No

Can we use 11kv Trivector Metre or Energy metre instead 33kv Metre at 33kv Over Head Line metering..

Answer / vimal patel

All digital meters can be used at any place like 220kv,66 kv , 33 kv and also 11kv..but first u have to see that metering range of Voltage and Current so u have to adjust that all phase Ct and PT Ratio upto that meter range and than find that MF ( Multiplying factor ) to get Unit.

Is This Answer Correct ?    2 Yes 1 No

Can we use 11kv Trivector Metre or Energy metre instead 33kv Metre at 33kv Over Head Line metering..

Answer / k.prakashchandra

The voltage input to both the meters is 110 V.So, you can
use and pre-set meter constant is to be considered

Is This Answer Correct ?    2 Yes 1 No

Can we use 11kv Trivector Metre or Energy metre instead 33kv Metre at 33kv Over Head Line metering..

Answer / saleem

The Digital Meter can be used with proper setting, however
the analog meter can not be used because its dial is
calibrated for 11KV.

Is This Answer Correct ?    3 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

why and how voltage sharing in transformer, during magnetic balance test ?

0 Answers   ME,


wat is the function of an inductor? examples.....

4 Answers  


explain how to protect high rise building from the risk of lighting.

1 Answers  


Can you explain the phase displacement between primary and secondary of power transformer of any vector group(for ex)?

1 Answers  


why the transformer is not operates on two phase?

1 Answers   APGenco, Atkins, FFBL,


if three phase supply is given to single phase transformer, what will happen?

3 Answers  


why are the likely reasons for bochholz & pressure relays oprate due to a internal fault but not differential relay ?

2 Answers  


Can we parallel two grid with different incoming voltage. Ex.let say one grid is 132kv and another is 220kv.

2 Answers  


what is principle in relay testing kit?

3 Answers  


Make a list observation on Transformer?

0 Answers   HSL,


what mean by machin

5 Answers  


why the Current transformers secodary is shorted to ground (In metering and Protection)

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)