in DG synchronization system can i short R,Y,B- phase(DG-1) to
R,Y,B Phase (DG-2), HOW IT WORK . WHAY WE NEED TO
SYNCHRONIZATION.
Answer / asif.k64@hotmail.com
DG synchronization is required to insure the smooth
operation of DG, in faulty or Overload condition, or if one of
the DG fails.
R,Y,B cannot be short as it may result into explosion.
| Is This Answer Correct ? | 1 Yes | 3 No |
what is ATS?and its function or operation in power system with its layout.
Please help me.What are the difference between two wire, 3wire, and 4 wire in electric meter?
what is the temperature rise test? explain in brief.with formula.
How we can calculate the capacity the Air Condition capacity? like 1 or 1.5 ton's, What is the means of volume of Ton's in capacity of Air Compressor? Why in ton's,? not any other Volume?
what is the main difference b/w contactor and relay
2 Answers Pace Pharmaceuticals,
if we want ot select cable size with reference to load current it take than what is the formula and it is same for aluminium or copper?
which type of A.C motor is used in the fan (ceiling fan, exhaust fan, padestal fan, bracket fan etc) which are find in the houses ?
25 Answers Airtel, MPPTCL, USSA,
What is an iron loss or core loss pi?
Why infinite busbar has zero resistance and high mechanical inertia?
the typical output of a solar cell is........
circuit breaker work alone during fault condition or need any relays ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)