in DG synchronization system can i short R,Y,B- phase(DG-1) to
R,Y,B Phase (DG-2), HOW IT WORK . WHAY WE NEED TO
SYNCHRONIZATION.
Answer Posted / asif.k64@hotmail.com
DG synchronization is required to insure the smooth
operation of DG, in faulty or Overload condition, or if one of
the DG fails.
R,Y,B cannot be short as it may result into explosion.
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
Define conversion efficiency of a power amplifier.
How stabilizer works??
what is th basic difference between a d latch time line and a d flip flop time line???
What is tranformer differtial?
fuel-air ratio in a petrol engine fitted with suction carburettor,operating with dirty air filter as compared to clean filter will be
What is a commutator?
What is measurement?
Type of motor stater detail and working detail
when ID fan will immediately stop through VFD what exactly cause and problem the ID fan
How do we calculate over and under frequency tolerance from generator data?
sir please send me previous year questions of jspl of electrical section through which i could prepare myself fpr the test.
Is there possible to Test Transformer for Overfluxing Capability. Or is there any firm who does Overfluxing Test on Transformer?
how you taken aotitude test
Can you explain about pole discrepancy scheme
The size and construction of bushings in a transformer depend upon?