in DG synchronization system can i short R,Y,B- phase(DG-1) to
R,Y,B Phase (DG-2), HOW IT WORK . WHAY WE NEED TO
SYNCHRONIZATION.
Answer Posted / asif.k64@hotmail.com
DG synchronization is required to insure the smooth
operation of DG, in faulty or Overload condition, or if one of
the DG fails.
R,Y,B cannot be short as it may result into explosion.
Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
please explain how to do 'pole drop test' on generator?
Why do we use copper cable for HT Supply and why not Aluminium?
Single line diagram for dbb (double bus bar)system.
how to modify DOL control panel into Delta Y connection?
Why the standard of ambient teperature mentioned as 40 degree celcius in machines.
i want use the cable size 16cx4 core aluminium usege watts 240x2000w this cable size is correct?
The series field winding has low resistance while the shunt field winding has high resistance. Why?
What is a dc motor?
What is the Minimum winding resistance of motors ( small & big)? referance range
how power is generated,and transmitted to our home..pls explain briefly in simple words.
11 kg trivevter meter has rating of -/5amps. And pt ratio11000/110v and is connected with 11kv ct/pt unit of cr ratio 75/5amps. And pt ratio of 11000/110v while checking accuracy of meter with HT Accuchek meter what value of PT ratio and CT ratio to be filled in Accuchek meter
what is the main function of capacitors in mccs.
Why wind turbines wheels rotate constantly
how to calculate distance between busbar supporters for LT panel, what are the factors influencing in this design
why the rotor current becomes in steady state during high slip region? please verify with equations.