in DG synchronization system can i short R,Y,B- phase(DG-1) to
R,Y,B Phase (DG-2), HOW IT WORK . WHAY WE NEED TO
SYNCHRONIZATION.

Answer Posted / asif.k64@hotmail.com

DG synchronization is required to insure the smooth
operation of DG, in faulty or Overload condition, or if one of
the DG fails.

R,Y,B cannot be short as it may result into explosion.

Is This Answer Correct ?    1 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Where burned of electricity,when,who, & why.

1511


How would your past experience translate into success in this job?

6462




1665


how can i get an electrical c-certificate?

1799


what is the ckt diagram of a tubelight and is it the simplest ckt of electrical engineering and also the component?

1853






what is High resistance grounding and whatis the criteria for the selection of High resistance grounding

1723


Draw a SLD of HT distribution EB grid up to users Transformer?

5668


What are the types of control system?

640


What are the main significances of root locus?

711


what is v/f control in VFD?

1075


There are different classes of protections in power plants.class a,b,c are clear..is there any class d and e r there..and elaborate class b protection.

1636


If a current -8+6sin6t is flowing three ammeter, one is a centre zero PMMC meter, one is true rms meter and one is moving iron meter. What are the reading of these three meter respectively?

1648


what is a pulse transformer? how rise time of pulse changes when ever the voltage changes?

1492


How to calculate the time setting for star connection in star delta starter? For example 10KW 3PH Induction motor.

2160


State ohm’s law?

658