how to control PQI (Project Quality Index)
Answers were Sorted based on User's Feedback
Answer / pradip a. sarkar
As per Deming,s Cycle PDCA
where P = Plan (what are the Plans)
D = Do (What to be done)
C = Check (As per Standard or Project Norm.)
A = Action ( If any deviation, take corrective, preventive Action for that)
| Is This Answer Correct ? | 4 Yes | 1 No |
Q Structural Behavior Of Statically Determinate And Indeterminate Reinforced Concrete Structure?
how can we differentiate the KOTA STONE and SHAHABAD STONE by vision?
An invisible line should intersect a visible line with
1 Answers PSC, PSCI, SPC Systems,
What is the bar bending schedule
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
what is the diferance np3 and np4 pipe
1 Answers Sharda Construction,
what is anchor bar??
what is the hanekom repairing material after concreting work
How much steel required for 1 sq. meter area?
1 Answers Aditya Constructions,
How many bags required for 1cum grouting?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
How to calculate quantity of plum masonry in 1:3:7
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)