how to control PQI (Project Quality Index)
Answers were Sorted based on User's Feedback
Answer / pradip a. sarkar
As per Deming,s Cycle PDCA
where P = Plan (what are the Plans)
D = Do (What to be done)
C = Check (As per Standard or Project Norm.)
A = Action ( If any deviation, take corrective, preventive Action for that)
| Is This Answer Correct ? | 4 Yes | 1 No |
How can we convert weight batch to volume batch for m30 mix
How much 1sqft area reinforce formula properly define
What is the biggest dam in america?
The relation between cube strength & cylinder strength because––
how to convert sand from Cum to Brass
why we always consider Bulkage due to the voids only for the Fine aggregates not for the Coarse aggregates
what is the difference between two way slab and flat slab? what is the benifits of flat slab?
1.why can't we used sea sand in construction? 2.can we change sea sand into normal sand? if yes how?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
0 Answers NCC, Sobha Developers,
How many bricks required for 1 cu.m
Advantages and Disadvantages of using fly ash bricks over clay bricks?
11 Answers Pradhi Engineering,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)