how to control PQI (Project Quality Index)
Answers were Sorted based on User's Feedback
Answer / pradip a. sarkar
As per Deming,s Cycle PDCA
where P = Plan (what are the Plans)
D = Do (What to be done)
C = Check (As per Standard or Project Norm.)
A = Action ( If any deviation, take corrective, preventive Action for that)
Is This Answer Correct ? | 4 Yes | 1 No |
how many cement bag in 1m*m*m
we do not provide reinforcement bar through the centre of a column.why?
Why provide strripus in a column minimum and maximum spacing.
What out turn civil works
How to test the quality of Ready Mix M20 concrete (1:1.5:3) before casting at site when lorry arrives? Are there any methods?
How to calculate the steel for 392c.meter*450c.meter rcc slab
what is conrete grade ,how are depent on concrete grad and size of concrete?
how much quantity of cement bags are required to fill the one m3 of empty container.?
12 Answers L&T, NBDL, SEW Infrastructure,
what is the out turn of one masson in plastering, masonary work in 8 hours, with limited healper? what is the out turn of corpender in form work? wood work? in 8 hour with limited healper? what is the out turn of bar bendarin 8 hour with limited healper for slabs, beams, coloumn?
What is the consumption of Brick in one meter cube both 6inch & 4inch thick
for construction of 1 cum of brickwork what is requirement of cement, sand and bricks
3 Answers Nirman Consultants, Shapoorji Pallonji Group(SPCL),
what is w/c ratio in dry lean concrete for m10 mix design