Answer Posted / pradip a. sarkar
As per Deming,s Cycle PDCA
where P = Plan (what are the Plans)
D = Do (What to be done)
C = Check (As per Standard or Project Norm.)
A = Action ( If any deviation, take corrective, preventive Action for that)
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
How many kilo-newtons equals 1000 kilogram?
What is the absolute pressure scale?
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
Where will be the maximum bending moment in a TEE Beam?
what are the ffactors you considered choosing the course?
rate analysis for cement pointing 1:4 , for 100 sq m
What is meaning of FREE STANDING STAIRCASE ?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
What are the steps involved in the concreting process?
What are the phases inspections are done by local authority while construction?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
what are the layers of the national and heir aprox thickness??
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight