Answer Posted / pradip a. sarkar
As per Deming,s Cycle PDCA
where P = Plan (what are the Plans)
D = Do (What to be done)
C = Check (As per Standard or Project Norm.)
A = Action ( If any deviation, take corrective, preventive Action for that)
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
what is the dimensions of river sand truck trailer or trolly ?
Formula of mid span bar
Differentiate orthographic and isometric projections?
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
what is flexible and rigid footing?
what is the difference between np2 and np3 concrete mix
How do you compute volume of airflow?
Calculation of curtain wall of box culvert
what are the types of dimensioning?
How to estabilish reinforcement Steel rolling margin for a building projects ?
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
RR masonry rate analysis