how to calculate no. of cement bags consumed in 1:4 and 1:6
proportion RR Masonary and the quantity of sand also

Answers were Sorted based on User's Feedback



how to calculate no. of cement bags consumed in 1:4 and 1:6 proportion RR Masonary and the quantit..

Answer / nisikanta

First of all calculate total volume of RR masonry.Then add
33% of volume more than actual volume of wet material.then
for 1:4 ;1 cement:4 coarse sand.Total volume/5=Vol of cement.
no of bags of cement=Vol of cement/.035.For 1:6 just put 6
in place of 4.

Is This Answer Correct ?    23 Yes 24 No

how to calculate no. of cement bags consumed in 1:4 and 1:6 proportion RR Masonary and the quantit..

Answer / sudhir pawar

Part A : The data :
Cement: 330/bag
Rubble : 2562/brass
Labour  :2200/brass
Sand 6500/ brass
You already know that : I brass = 100 Cft
Desired  Profit 25%

Specifications :
Rubble masonry Width 18″ to 36"
for wall compound ht upto 3′ from ground level
 in cement mortar in ratio : ( 1:5 )

Material for 1 cum:
Cement : 330*(0.45*1.57*28.8)/6= Rs.1119
Sand:   6500*0.3529*5*(0.45*1.57)/6= Rs.1350.50
Rubble: 2562*0.3529*1.45 = Rs.1311
Labour : 2200*0.3529= Rs.776

Total:                        Rs.3756 RS. 4556.50
Profit:Add@ 25%:      Rs. 1139.13
                   Total:  Rs. 5695.63  Rs/cum.

Is This Answer Correct ?    2 Yes 6 No

how to calculate no. of cement bags consumed in 1:4 and 1:6 proportion RR Masonary and the quantit..

Answer / j.edison

cement mortar1;4 1440divided by4=360kg
cement mortar 1;6 1440divided by 6=240kg

Is This Answer Correct ?    17 Yes 24 No

Post New Answer

More Civil Engineering Interview Questions

whate the size of bricks are avalable at site

5 Answers  


what is stress

5 Answers  


what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)

0 Answers  


how much quantity a skilled labour and unskilled does Pcc per day, if ratio is(1:2:4)

3 Answers  


which one is strong? field weld or shop weld?

6 Answers   CCCL,






Diagonal check is required for a layout work to confirm ––

3 Answers  


Wats the purpose of lap length? Is it for strength or increasing of span

1 Answers  


Explain the different types of building contracts?

0 Answers  


waht is the range of compacting factor test result for good concreate?

1 Answers  


how much thickness of roof truss?

1 Answers  


for plaster what is the suitable sand.

3 Answers  


What is the difference between undo & redo?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)