Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


entry criteria and exit criteria for unit testing, integration
testing, system testing and uat



entry criteria and exit criteria for unit testing, integration testing, system testing and uat..

Answer / neethu sebastian

Entry criteria for unit test
1.) All the requirement and documents are reviewed, finalized and approved.
2.) Application development should be completed
3.) Test environment is ready
4.) UnitTest Framework must be ready (in case of automated unit testing)
5.) Unit testing tools like Rational Software, JavaScript Assertion Unit, CUT, Dotunit ...etc (if tools are using) must be installed and configured.
(** last 2 points are optional hence can be avoided in interviews)

Exit criteria for Unit testing
1.) All the Unit test cases are executed.
2.) All the defects are resolved.
3.) coding is completed
4.) Code optimization (removal of redundant code, labeling of codes, removal of unused labels, removal of warning ..etc) is completed.

Entry criteria for integration testing
1.) Unit test exit criteria must meet
2.) Test environment should be ready
3.) Integration plan should be ready.
4.) Each module must gone through unit testing before the integration process.

Exit Criteria for Integration testing
1.) Successful execution of the integration tests.
2.) All priority bugs are resolve and closed.


Entry criteria for System testing
1.) Successful completion of integration testing process.
2.) Priority bugs found during integration testing must be fixed and closed.
3.) System testing environment must be available.
4.) Test cases must be available to execute

Exit Criteria for system testing
1.) Successful execution of the system tests.
2.) All specified business and functional requirements must be met.
3.) Priority bugs have been fixed and closed.
4.) Systems compatibility must be tested on various platforms

Entry Criteria for acceptance testing
1.) Successful completion of system testing phase.
2.) Priority bugs found during previous testing activities must be fixed and closed.
3.) Functional and Business requirement must be met.
4.) Acceptance testing environment should be ready.
5.) Test cases must be available.

Exit Criteria of Acceptance testing
1.) Successful execution of the user acceptance tests.
2.) approval for test Closure
3.)All Business requirements must be fulfilled.
4.) No critical defects are left out.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Manual Testing Interview Questions

what comments have u given in peer review? tell me at least 3 comments what u have given? july27 brahma412@yahoo.co.in

2 Answers   CTS,


Adobe puzzles: . . . . . . . . . connect all these dots using 4 continuous lines.one clue u can extend the line after the points also. 2.one basket contains apples,second basket contains oranges and third basket contains apples and oranges the labels are wrongly mentioned.pick one fruit from one of these basket and find which basket contain which fruits.

2 Answers   Adobe, TCS,


Diff B/w Test Strategy and test plan

1 Answers  


What's the difference between Stress testing & Load testing

4 Answers  


What is common interface?

0 Answers  


how can u do regression testing tell me procedure?

17 Answers   TCS,


1.Write the Test Case for Electrical Motor? 2.Write the Sql Query for Average Calculation? 3.Tell me about your self? 4.What is your Resposiblities? 5.Tell me about your Project Details? 6.Write the Negative Test case for Electrical Motor?

1 Answers   Verizon,


U have a Scenario and there is box to enter values from 0 to 1000. Now what is the Test data u will test? What are the positive and negative test cases? How will U use Equivalence class Partition ?

4 Answers  


write the test cases on prime number with result?

6 Answers   Allied Group, Zycus Infotech,


What is industry standard for code coverage numbers?

1 Answers  


what is test data?how test data is prepared? are there any guidelines/methods to prepare it?

4 Answers  


who will assign the seviourity & priority for a BUG in a project ? tester or any other.......... ????

6 Answers  


Categories