Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


entry criteria and exit criteria for unit testing, integration
testing, system testing and uat



entry criteria and exit criteria for unit testing, integration testing, system testing and uat..

Answer / neethu sebastian

Entry criteria for unit test
1.) All the requirement and documents are reviewed, finalized and approved.
2.) Application development should be completed
3.) Test environment is ready
4.) UnitTest Framework must be ready (in case of automated unit testing)
5.) Unit testing tools like Rational Software, JavaScript Assertion Unit, CUT, Dotunit ...etc (if tools are using) must be installed and configured.
(** last 2 points are optional hence can be avoided in interviews)

Exit criteria for Unit testing
1.) All the Unit test cases are executed.
2.) All the defects are resolved.
3.) coding is completed
4.) Code optimization (removal of redundant code, labeling of codes, removal of unused labels, removal of warning ..etc) is completed.

Entry criteria for integration testing
1.) Unit test exit criteria must meet
2.) Test environment should be ready
3.) Integration plan should be ready.
4.) Each module must gone through unit testing before the integration process.

Exit Criteria for Integration testing
1.) Successful execution of the integration tests.
2.) All priority bugs are resolve and closed.


Entry criteria for System testing
1.) Successful completion of integration testing process.
2.) Priority bugs found during integration testing must be fixed and closed.
3.) System testing environment must be available.
4.) Test cases must be available to execute

Exit Criteria for system testing
1.) Successful execution of the system tests.
2.) All specified business and functional requirements must be met.
3.) Priority bugs have been fixed and closed.
4.) Systems compatibility must be tested on various platforms

Entry Criteria for acceptance testing
1.) Successful completion of system testing phase.
2.) Priority bugs found during previous testing activities must be fixed and closed.
3.) Functional and Business requirement must be met.
4.) Acceptance testing environment should be ready.
5.) Test cases must be available.

Exit Criteria of Acceptance testing
1.) Successful execution of the user acceptance tests.
2.) approval for test Closure
3.)All Business requirements must be fulfilled.
4.) No critical defects are left out.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Manual Testing Interview Questions

What is difference between windows 2000 server and windows 2003 server

23 Answers   CMS, IBM, Logica CMG, Microsoft, nvidia, PC Solutions, Satyam, Slash Support, Symantec, Vee Technologies, Veritas, Wipro,


what is the difference between quality control and quality assurance?

5 Answers  


Realizing you won't be able to test everything - how do you decide what to test first?

4 Answers  


1.Unit testing ->integration testing->system testing->UAT in this where do u do the functional testing & regression testing? if these two done in each phase why should not mentioned in that ?

6 Answers   ITC Infotech,


what is diffrerence between build and version

4 Answers   Hexaware,


What is the difference between qc and qa? What are the responsibilities of qc and qa?

3 Answers  


what is walkthrough?

8 Answers  


What are the points to be considered while testing an application on different browsers like firefox, opera, mozilla, ie etc. on both windows & linux ??

2 Answers   IBM,


If a interviewer ask me the duration of my project, then should i tell them the total(development+testing) time of the project? Plz tell it's urgent

6 Answers  


Hello. I am not here to answer your question. I jus found a job as software QA engr. And i am totally new to software testing. So can someone pls help me in the following scenario? there is this registration screen, and it contain: One textbox called Nickname which only accept alphanumerical One textbox called Contact which only accept numerical, One textbox called Email which can be filled with alphanumerical and symbol and One button called Register now becos there is so many textboxes, where i can filled with alphabet, number, symbol, "just space", leading zeros, leading space. there will be lots of combination. can someone pls help.. i will be appreciated if u can post the test case of the scenario i mentioned. Lots of Thanks

0 Answers  


on what basis low,medium,high,critical will be assigned to a bug.give m examples

2 Answers  


Negative test cases for phone camera

0 Answers  


Categories