Please tell me about building work from
begining
Answers were Sorted based on User's Feedback
Answer / r satya nagendra babu
stage - 01 fixing of boundries,
STAGE - 02 Layouting,
Stage - 03 Marking the footing for excavation,
Stage - 04 sub structure,( footing =s and columns uo to plinth beam )
Stage - 05 Super stucture ( Plinth beam to Slab ie,,,which is above the plinth beam )
Stage - 06 Finishings,( Brick work Plasting Painting And All other activites)
Is This Answer Correct ? | 0 Yes | 0 No |
how to convert cement, sand aggregate quantity from M3 to kg with full description?
what is anchorage? Why anchoring of reinforcing bars necessary and what are the shapes ?
if compressive strength on 28day pass, and client is asking core test. is there any thing in standards allows that??
what are the mixing of M10,M15,M20,M25,M30grades?
What is the quantity of cement in mix m20 concrete?
what interested you in becoming a civil engineer?
Instrument used for determining PH of water
what is the calculation of raw material for 0.35cum of m-15
whaat is blister in box girder bridge and what is its function..
the moisture content of the soil below which the soil volume becomes constant ie called liquid limit plastic limlt shrinkage limit none
1 cft of brickwork 1:6 mortar ratio need 12 numbers of bricks so find the quantity of sand and number of cement bags
what is mean by quality in terms of construction