Please tell me about building work from
begining
Answers were Sorted based on User's Feedback
Answer / r satya nagendra babu
stage - 01 fixing of boundries,
STAGE - 02 Layouting,
Stage - 03 Marking the footing for excavation,
Stage - 04 sub structure,( footing =s and columns uo to plinth beam )
Stage - 05 Super stucture ( Plinth beam to Slab ie,,,which is above the plinth beam )
Stage - 06 Finishings,( Brick work Plasting Painting And All other activites)
Is This Answer Correct ? | 0 Yes | 0 No |
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
what is the basic difference between Coloumn & Shear Wall
What is Paste :
24. Why should we hire you?
plz.show development and anchorage length in simple diagram.
m-25
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
Why we are using coarse sand for brick work and is there any technical problem if, we use fine sand instead of coarse sand.
how many bags of cement,sand and Aggregate to p.c.c. of 1:2:4 ratio.
what is the praposion of M30 concrete mix.
what is P.C.C ?
How are freeway bridges built?