Answer / r satya nagendra babu
stage - 01 fixing of boundries,
STAGE - 02 Layouting,
Stage - 03 Marking the footing for excavation,
Stage - 04 sub structure,( footing =s and columns uo to plinth beam )
Stage - 05 Super stucture ( Plinth beam to Slab ie,,,which is above the plinth beam )
Stage - 06 Finishings,( Brick work Plasting Painting And All other activites)
| Is This Answer Correct ? | 0 Yes | 0 No |
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
I am constructing a house having 20' X 19' hall. Do I need to go for a concealed beam. any alternative please? Thanks if a design is provided.
Why is the statue of liberty made of copper?
which I.S. code shown wastage in structural steel
10mm Rebar total 12meters length how to calculate ?
what is the quantity of cement( in bags),sand and aggregates required for 1 cmt of M 25 concrete
what is mean by splice length? As there were any formula to calculate the splice lenght?
How can we compact the soil on slope portion? What is the Grade II of Stone Metal?What type tests carried out on BBM road?
cross hairs in surveying telescope are fitted in the objective lense at the center of the telescope at the optical centre of eyepiece in front of the eyepiece
What are the Tests required to check the Quality of bar?
How can you achieve soil enforcement?
what is right & short method of measurement of slab&beam
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)