Answer Posted / r satya nagendra babu
stage - 01 fixing of boundries,
STAGE - 02 Layouting,
Stage - 03 Marking the footing for excavation,
Stage - 04 sub structure,( footing =s and columns uo to plinth beam )
Stage - 05 Super stucture ( Plinth beam to Slab ie,,,which is above the plinth beam )
Stage - 06 Finishings,( Brick work Plasting Painting And All other activites)
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What was asked in isro civil interview
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
What Are The Steps Involved In The Concreting Process, Explain?
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
Who name us Engineer & Why?
significance of specific surface area of particles?
Who designed the city of washington dc?
how to calculate steel for slab or footings?
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
How many feet are in 4 square yards?
How to calculate unit weight of concrete for m40 grade.
How high should the water tank be to provide a 60 psi at base of this water tower?
During reclamation how can the occurrence of mud waves can be rectified?
What is difference between engineering stress and true stress?