Answer Posted / r satya nagendra babu
stage - 01 fixing of boundries,
STAGE - 02 Layouting,
Stage - 03 Marking the footing for excavation,
Stage - 04 sub structure,( footing =s and columns uo to plinth beam )
Stage - 05 Super stucture ( Plinth beam to Slab ie,,,which is above the plinth beam )
Stage - 06 Finishings,( Brick work Plasting Painting And All other activites)
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Describe the various methods of concrete curing?
how to conversation of all construction material in to brass
what is meant by residual strain?
how to preaper for interview wat they asked in interview give me idea
How to make a c++ program that converts any base to base 10?
What is the usage of zoom command?
For what purpose bedding is used under storm water drains?
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
why does the most of civil engg is not intersted to going for teaching field?
explain the advantages of total stasion
What is dead load impact load live load
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
How to build the floor to ceiling bookcase?
how to identify the failure of building by expansive soils
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.