stage - 01 fixing of boundries,
STAGE - 02 Layouting,
Stage - 03 Marking the footing for excavation,
Stage - 04 sub structure,( footing =s and columns uo to plinth beam )
Stage - 05 Super stucture ( Plinth beam to Slab ie,,,which is above the plinth beam )
Stage - 06 Finishings,( Brick work Plasting Painting And All other activites)
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are the advantages of building a dam on the river nile?
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
What is bylayer?
How to find beam R/F cutting length
What is meant by a context menu in a cad software?
Define What happens to Load at yielding ?
Rate analysis of Vitrified tile in cement mortor 1:3
In case if concrete box girder bridges how is the number of cells determined?
How to calculate canal slope curvature qty!
Concrete cover for slab, column, beam and footing?
How does a traffic light signal work ?
What are the composition of a landfill?
IS code for grade of concrete for bamboo lintel????
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?