Dear all, i completed M.E(Power Electronics & Drives) 2011
passed out having 78% so i need job in core side but i don't
know how can i receive the calls from electrical companies
and i uploaded my CV in naukri, times jobs etc.. In that iam
not recieved any mails from good companies so give me best
procedure plzzzzzzzzzzzzzzzzzzzzzzzz.....
Thanks,
K.Linga Reddy
Email-id:-lingareddykmthm@gmail.com
Ph no:-08015402078
Answer / thirumala.b
Dear reddy,
kindly go through web "electronics bazzar-key ems players
in india" in that website you will get all the information
about who are the leading companies in
semiconductors,electronics,powerelectronics,solar
industry,led industry,power industry,etc. you will get all
the information.
if you wany any support, definetely i will give good
suggessions.
I wish good luck to your good career in future.
Thank you .
B.Thirumala.
| Is This Answer Correct ? | 4 Yes | 0 No |
What should be the BDV value of a new transformer oil
EXPLAIN WORKING PRINCIPLE OF ALTERNATOR & MOTORS.
sir, i am 3 years diploma course pass out candidate.what type of certificate can i got in marine service.
if its possible for step up or step down DC volage directly ? possible means how we can do it ?
Hi, I'm going to attend BHEL interview for exexutive trainee (ET ) on 22nd DEC . Till now if anyone attended the interview pls help me out regarding the interview. I'm an electrical engineer
what is the speed of electricity?
What are the advantages of speed control using thyrister?
For a CT the number of turns in the primary winding is.........
hii.i am a B.TECH(EEE) graduate.i want 2 know wat type of qusns r asked in sbi clerk interview 2 candidates like me??kindly post answers ASAP..
Dear Sirs, I am a technical persons.In one of our Electrical Sub- Station, We have installed three numbers of 1250KVA ,11KV/0.415KV Transformer to feed the Factory load. We have found some abnormality. In one of our Transformers the leakeage current from transformer body to earth through earth continuity wire is almost 86 Amp but in other transformer it is (5-10)Amp. where the load current on three phase and neutral are respectively 1360Amp,1400Amp,1370 Amp & 176Amp. So please any technical person help me about the reasons of this situation and how I can rectify the fault. Moreover,I have measured the earth resistance of the Earth continuity wire which is less than 1 Ohm. Thanks Tapas Barua
Describe kW and kva and difference between
The objective of connecting a resistance and capacitance across gate circuit is to protect the SCR against
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)