what dose the arrow indicate in the symbol of power
transformer?
Answer / k.prakashchandra
The triangle represents delta connection
| Is This Answer Correct ? | 3 Yes | 6 No |
why would the rotor rotate at sub synchronous speed against the direction of rotating flux when d rotor of 3 phase IM is connected to 3 phase balanced supply and the stator windings are shortcircuited ??
what is general test conduted by transformer
What are the starting currents of different motors and also what are the running currents, and idle currents?
can any one provide me a connection wiring diagram for a DG set control panel along with BOM?
why we used to transmitt the power at higher voltage why not at lower voltage
How to test lightning Arrester?
How to take vector group test for Ynd11 transformer.
why restricted earth fault protection can not operate for phase faults??as there will be a current in secondary of ct,when a phase fault occurs!
The unit of current is the:(a) Volt(b) Coulomb(c) Joule(d) Ampere
How can calculate the rating of a alternator for a given specific load with formula
0 Answers NRSC National Remote Sensing Centre,
what happens if DC earthing and AC earthings are shorted?
I hv a question regarding power factor improvement just after transformer. I request you to reply me plzz. thank you sir. My friend has a small unit of fabrication. in his factory the main load is a welding machine, lathe machine, grinding machine. this load is not continuous type. now our electricity board has installed 16 KVA, 11000/433 V transformer for our factory. In the energy meter (trivector meter) at LV side of transformer, i hv seen power factor value of 0.15 only when only 3 KW load was flowing. Further electricity board has suggested to install 4 KVAR capacitor at LV side after energy meter. Now my question is that if we permanantly install and switch on 4 KVAR capacitor after energy meter, during some load on transformer and also without any load on transformer, wht will be the power factor shown in energy meter?i dont want to get any penalty by electricity board, so plz suggest me if i can permanantly install and switch on the 4 kvar capacitor or not at LV side of transformer just after energy meter? Thank you again and awaiting for ur positive reply soon.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)