Answer / shaikh moyunuddin
to calculate ratio 1:2:4
we consider 1 cu.m. ratio 1:2:4
total quantity=1+2+4=7
for cement=1*15.2/7=2.17cu.m.
for bag=2.17/0.35=6.20 bag
for sand=2.17*2=4.34cu.m.
for aggregate=2.17*4=8.68cu.m.
Is This Answer Correct ? | 19 Yes | 14 No |
please briefly explain calculating or estimating steel quantity for a RCC column?
How du we calculate dry cement (in Bags) for any concrete, also sand and aggregate? How many bags of cement does 100 cft of concrete 1:2:4 require? Procedure to calculate the required amount. Also if there is any easy thumb rule to find out.
1 cft of brickwork 1:6 mortar ratio need 12 numbers of bricks so find the quantity of sand and number of cement bags
how to calculate the no. of brick (18'*9'-wall)
Explain the advantages and disadvantages of using plastic and timber fenders?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing.
5 Answers Dee Vee Projects, L&T,
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
Who name us Engineer & Why?
what is the safe bearing capacity of hard murum? can we consider it 50 ton?m2
What are the uses of groynes?
How many types of stirrups are there? How to calculate their cut lengths?
Construction joint of beam & slab is provided at––