How calculate the material in concrete mix in ratio 1:2:4 ?
Answer Posted / guest
1cement 2 sand 4 mittel
| Is This Answer Correct ? | 2 Yes | 12 No |
Post New Answer View All Answers
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
what is the price of a cubic meter of concrete on international market?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
how much cement and sand required for 1cum rr masonry
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
What are your future hopes for this job?
types of survey and levelling instrument ?
rimmer in pile foundation
What are the methods of measurement? Describe it shortly
how much of the strength comes from post-production curing
For fine aggregate which is most suitable River sand or crusher sand & why ?
What is the difference between routing maintenance and major maintenance in school facilities?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate