How calculate the material in concrete mix in ratio 1:2:4 ?
Answer Posted / guest
1cement 2 sand 4 mittel
Is This Answer Correct ? | 2 Yes | 12 No |
Post New Answer View All Answers
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
what is Brest Wall?
What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????
how to shuttering is used in slab
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
How can i do RCC rate analysis?
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
use ofr concrete as per grade ?
how to take concrete quantity for precast segment for viaduct project?
What in your past experience or education prepares you for the position for which you are applying
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
Would you cause a 55-gallon drum of water to weigh more by climbing in?
How does siphoning work?
Will going from a 3-tap to 6-tap increase water pressure?