How calculate the material in concrete mix in ratio 1:2:4 ?
Answer Posted / shaikh moyunuddin
to calculate ratio 1:2:4
we consider 1 cu.m. ratio 1:2:4
total quantity=1+2+4=7
for cement=1*15.2/7=2.17cu.m.
for bag=2.17/0.35=6.20 bag
for sand=2.17*2=4.34cu.m.
for aggregate=2.17*4=8.68cu.m.
| Is This Answer Correct ? | 19 Yes | 14 No |
Post New Answer View All Answers
What is horizon or horizontal mining?
What is meant by cartesian coordinate system?
what is castigliano theaorem
what is detail procedure of eccentric footing? plz. give solved exmple?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
VAT and CST ? Which benefits for buyer ? Why benefits?
how much of the strength comes from post-production curing
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
What is thumb rule for deep trench excavation
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
What is the difference between a wood shake and wood shingles?
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
rate analysis for cement pointing 1:4 , for 100 sq m
how much tempareture are required to make liquid state of pid leed