pls mail some more tecnical qustions at msaranya2610@gmail.com
No Answer is Posted For this Question
Be the First to Post Answer
When you received a RA Bill of contractor at HO duly checked and certified by Site In-charge, How to know at a glance it is complete in order, do have any one checklist format in this regard.
A floor has to be removed partially with block work tying floors together, can block work continue on floor that has to removed excluding demolishing works tying floor from underside of slab and top of slab demolishing floor upon completion?
how to check and keep control on the wastage of material at site
0 Answers Aashray Design Consultants, ABC Infra, Jain Group,
how to calculate number of bricks
Does brick grows bigger every year?
Plese tell me about cranked beam (end hook lenth, crank angle, crank length). Thanks.
3,6,13,26,33,66,____
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
how many kg sand is requried for plastring in 100 sqft?
What is the bearing capacity of black cotton soil, normal soil and rock?
what is the max. area can we apply the plate load test ?
What should be the size (Cubic meter) of a water tank for 1000 Ltrs. capacity?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)