For a filter type operations the capacitor banks are connected in series with the circuit.
It is used to eliminate undesired frequency components resulting from thyristor controlled circuits.It is also used in order to separate out carrier frequency signal from the audio frequency in AM detection.
| Is This Answer Correct ? | 1 Yes | 2 No |
what is the main function of lbb protection
Why current shoots up in the secondary on the knee point voltage during saturation test of CT? How core saturation effects the secondary current (while the primary side is open)? What the logic behind this?
why occ characteristics of generator is also called as magnatization characteristics
what is RTD? what is THERMOCOUPLE? What is difference between it?
Differentiate between kirchhoff’s first law and kirchhoff’s second law?
what is the meaning of TRF
What is meant by H.R.C fuse?
40 Answers Gas Projects, GSCE, Taj Group,
If DG runing time neutral is disconnected what will be the effect in Engine and Electricial panel.
What should be ideal IR value for 11kV, un earthed, 1 MW motor?
what are the advantages and disadvantages of oil filled cables over XLPE cables
What is difference between earth leakage relay and restricted earth fault relay ?
I hv a question regarding power factor improvement just after transformer. I request you to reply me plzz. thank you sir. My friend has a small unit of fabrication. in his factory the main load is a welding machine, lathe machine, grinding machine. this load is not continuous type. now our electricity board has installed 16 KVA, 11000/433 V transformer for our factory. In the energy meter (trivector meter) at LV side of transformer, i hv seen power factor value of 0.15 only when only 3 KW load was flowing. Further electricity board has suggested to install 4 KVAR capacitor at LV side after energy meter. Now my question is that if we permanantly install and switch on 4 KVAR capacitor after energy meter, during some load on transformer and also without any load on transformer, wht will be the power factor shown in energy meter?i dont want to get any penalty by electricity board, so plz suggest me if i can permanantly install and switch on the 4 kvar capacitor or not at LV side of transformer just after energy meter? Thank you again and awaiting for ur positive reply soon.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)