which braking is used in traction motor and what is its
working send at mukeskumar27@hotmail.com
Answers were Sorted based on User's Feedback
Answer / k.prakashchandra
In case of DC traction motors initially electrical braking
is employed by increasing field excitation to feed the power
to system and later, mechanical brakes are applied.
| Is This Answer Correct ? | 2 Yes | 0 No |
what is the role of transistor in Circuit?
How many wall/floor flange will i use in bus duct system if we have in our design a 35th floor building.
hi friend i am going too attend for hpcl in this month please help me by sending written test question papers i am in the stream of E.E.E
we are using three transformer 33000/430 vac for three separet block.all three transformer have three LT panel separetly. can be Interconnected all three panel through bus coupler. this is permissable or not by state electricity board.
in telecom we are using neutral?
what is the minimum recommended leakage current of an earthed cable connected to the body or skid of an alternator
why transmition and distribution and genaration of voltage in multible of 11 means 220v,440v,11kv,22kv,,,...so on
what is the difference between a hooter and a mcp
why weight is put on pulley?
In LT Line What is the minimum clearance required between phase to phase busbar & between Phase to body of the panel? Also between Neutral &phase, & Neutral & body of panel. as per standards.
I have a question, I visit 01 site and face a problem, there is 2.5 ton Air Con working, when air con compressor is running at that time rectifier voltages are increasing upto 290-295 v and rectifier is giving main high alarm (rectifier is APC single phase), before starting compressor rectifier voltages was 230v. when air con is going off rectifier voltages are decreasing smoothly at its actual voltages 230v. Load on Genset phases is this: Red-13.5 amp AC (Air Con load), Yellow-1.7 amp AC (BTS lights etc.) and Blew-4 amp AC (telecom system load), Genset phase to phase and neutral to phase voltages are also ok. These are 10 sites having same system and same rectifier APC brand at every site 02 genset are working but the problem is same at all these 10 sites. What will be the reason behind???
IT IS DESIRABLE THAT THE INCOMING MACHINE SHOULD BE A LITTLE FAST AT THE TIME OF SYNCHRONIZING.EXPLAIN?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)