84 mens complete the work in 17 day. how much time 119
person take to complete the work.
Answers were Sorted based on User's Feedback
Answer / letsdofun
how much total work is 84x17=1428
day will be taken by 119 person 1428\119=12
Is This Answer Correct ? | 38 Yes | 1 No |
Answer / aaaaaaaaa
84x17=1428 is the total work done by men
day will be reqiued is =1428/119
Is This Answer Correct ? | 5 Yes | 2 No |
17) How many integers between 100 and 150, inclusive, cannot be evenly divided by 3 nor 5? a) 35 b) 27 c) 25 d) 26 e) 28
There were 750 people when the first song was sung. After each song 50 people are leaving the hall. Howmany songs are sung to make them zero?
124,235,346,457,568,___,___.
How many ways can one arrange the word EDUCATION such that relative positions of vowels and consonants remains same?
statebankofindia clerk post model question papers 1 copy send my e-mail id alagi_1987@yahoo.co.in
7 Answers State Bank Of India SBI,
Two lemons cost 10 cents. Then one and a half dozen cost
0 Answers BPCL Bharat Petroleum, Sonata,
Time constant for an integrator and differentiator should be
The speed ratio of two trains is 5:7,first train is travelling at a speed of 350 km/hr, what is the speed of the second train?
7:53 8=?
A chocolate block is of 4 X 4 size.How many cuts are needed to make 1 X 1 size blocks. No simultaneous vert. & horz. cuts?
The population of a city increases @ 4% p.a. There is an additional annual increase of 4% of the population due to the influx of job seekers, find the % increase in population after 2 years ?
0 Answers 3i Infotech, Amazon, Canara Bank, Mu Sigma,
what is the pattern for MAQ Software company