84 mens complete the work in 17 day. how much time 119
person take to complete the work.

Answer Posted / letsdofun

how much total work is 84x17=1428

day will be taken by 119 person 1428\119=12

Is This Answer Correct ?    38 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Numbers of animals is 11 more than the number of birds. If the number of birds were the number of animals and number of animals were the number of birds( ie., interchanging number s of animals and birds.), the total number of legs get reduced by one fifth(1/5). How many no. of birds and animals were there?

1346


Find the result of the following _expression if, M denotes modulus operation, R denotes round-off, T denotes truncation: M(373,5)+R(3.4)+T(7.7)+R(5.8)

1316


The square of a two digit number is divided by half the number. After 36 is added to the quotient, this sum is then divided by 2. The digits of the resulting number are the same as those in the original number, but they are in reverse order. The ten's place of the original number is equal to twice the difference between its digits. What is the number?

890


Travelling for 9 days. total dist to be covered is 1080 miles. Dist covered per day must be 20 miles then that of previous day. what dist is covered

854


A person went to shop and asked for change for 1.15 paise. But he said that he could not only give change for one rupee but also for 50p, 25p, 10p and 5p. What were the coins he had ?

867






A son and father goes for boating in river upstream . After rowing for 1 mile son notices the hat of his father falling in the river. After 5min. he tells his father that his hat has fallen. So they turn around and are able to pick the hat at the point from where they began boating after 5 min.Tell the speed of river.

829


A monkey starts climbing up a tree 20ft. tall. Each hour, it hops 3ft. and slips back 2ft. How much time would it take the monkey to reach the top?

911


Find the value of the 678 to the base 7.

736


A can do a work in 8 days, B can do a work in 7 days, C can do a work in 6 days. A works on the first day, B works on the second day and C on the third day rely. that is they work on alternate days. When will they finish the work.(which day will they finish the work) (7+7/168)

727


A is driving on a highway when the police fines him for over speeding and exceeding the limit by 10 km/hr.same time B is fined for over speeding by twice the amount by which A exceeded the limit.If he was driving at km/hr what is the speed limit for the road?

1219


During a given week A programmer spends 1/4 of his time preparing flow chart, 3/8 of his time coding and the rest of the time in debugging the programs. If he works 48 hours during the week , how many hours did he spend debugging the program.

809


There are 4 boys and 3 girls. What is the probability the boys and girls sit alternately?

776


In a storage stall of 5x3x2inch.How many blanks of size 2x1x1inch can be stored..

1487


if x/y =4 and y is not '0' what % of 'x' is '2x-y'

750


What is the code formed by reversing the First and second letters, the third and fourth letters and son on of the string SIMULTANEOUSLY?

715