84 mens complete the work in 17 day. how much time 119
person take to complete the work.
Answer Posted / aaaaaaaaa
84x17=1428 is the total work done by men
day will be reqiued is =1428/119
Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
At 20% discount, a cycle is sold at a selling price of 2500 Rs. What is the actual price?
A mother is 30 years older than her daughter however she will be only thrice as old as the daughter after 5 years. What is mother’s present age ?
low temperature at the night in a city is 1/3 more than ½ hinge as higher temperature in a day. sum of the low temp and higherst temp is 100C. then what is the low temperature
a person went to a shop and asked for change for 1.15paise. but he said that he could not only give change for one rupee. but also for 50p,25p,10p and 5p. what were the coins he had
A student gets 70% in one subject, 80% in the other. To get an overall of 75% how much should get in third subject.
If shalu buys 6 more apples, his carton will weigh 14.5 kilograms.if the weight of one apple is 250 grams.how many apples did he initially had in his carton?
A train blows a siren one hour after starting from the station. After that it travels at 3/5th of its speed it reaches the next station 2 hours behind schedule. If it had a problem 50 miles farther from the previous case,it would have reached 40 minutes sooner. Find the distance between the two stations .
A 2D array is declared as A[9,7] and each element requires 2 byte.If A[ 1,1 ] is stored in 3000. Find the memory of A[8,5] ?
An apple seller is having some apples. He is selling half of the apple what he has plus half the apple to the first customer. In the same way he sells the remaining apple to 7 customers. After selling to 7 customers, he has no apples with him.
a cube has colors blue,red ,yellow each on two opposite sides.cube is divided into "32 small cubes and 4 large cubes". how many cubes (on 36 cubes) have blue at least one side. how many cubes have colors on two sides.
Find the next series: AC CG GO OE ?
the average of seven numbers is 2.5 then their product
a hollow space on earth surface is to be fille((d) total cost of filling is rs 20000. The cost of filling per mt3 is rs 225 .how many times a size of 3 mt3 soil is required to fill the hollow space?
Time constant for an integrator and differentiator should be
if on a salary s per month, a tax of x% of the salary and another of r% of the salary is deducted what is the income.