I have certain queries, please help to solve. a) length of
pile bore is 4m.excavation quantity will be area * length
where area will be pi/4 * dia*dia. Is this right? b) It is
a single reamed pile of 300m dia and reamed dia is 750mm.
can any body help me to calculate excavated quantity of
this bulb(reamed section),, concrete quantity in bulb with
showing the formulas to be used?
No Answer is Posted For this Question
Be the First to Post Answer
what is rigid pavement
How will you reduce the concrete flow after mixing the concrete
115mm thickness brick work how to required mortar
What is unit weight of normal concrete?
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
Why we do soil classification?
deshuttering time for RCC wall & column
definition of compressive strength. definition of compressive stress.
what is cross hair cursor?
define the authorized overlap in columns
Define the various stages of the project planning process in construction.
How to calculate the no of bags required for 12mm thick 1:6 plastering?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)