I have certain queries, please help to solve. a) length of
pile bore is 4m.excavation quantity will be area * length
where area will be pi/4 * dia*dia. Is this right? b) It is
a single reamed pile of 300m dia and reamed dia is 750mm.
can any body help me to calculate excavated quantity of
this bulb(reamed section),, concrete quantity in bulb with
showing the formulas to be used?
No Answer is Posted For this Question
Be the First to Post Answer
How to calculate cement qty of M10, m20, m25 ? I got the formula but I lost it.
how to calculate reinforcment in staircase cranked beam?
Define What is passive earth pressure ?
Is there the dry coefficient of cement is constant?
what is tmc ,term is used in measureing water, pls tell me 1 tmc = how many litres?
18 Answers College School Exams Tests, Irrigation, IT Consulting Services, IVRCL,
What is the difference between "working stress method" And "limit state method"?
What is the meaning of unit weight of cement?
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
How Much Anailed Wire (Binding Wire) use Per KG in Running Meter ?
What is the different type of slump test indications?
how many bags of cement,sand and Aggregate to p.c.c. of 1:2:4 ratio.
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?