I have certain queries, please help to solve. a) length of
pile bore is 4m.excavation quantity will be area * length
where area will be pi/4 * dia*dia. Is this right? b) It is
a single reamed pile of 300m dia and reamed dia is 750mm.
can any body help me to calculate excavated quantity of
this bulb(reamed section),, concrete quantity in bulb with
showing the formulas to be used?
No Answer is Posted For this Question
Be the First to Post Answer
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
what isIS code no for preparation of BAR BENDING SHEDULE (BBS)
What is meaning of tlc
What is the meaning of Fe415 ?
6 Answers Arul Constructions, L&T, SSM,
What is the rate of earthwork excavation?
what is meant by expansion joints in concrete structures?
Which is economical... A column of size 9"*9" Using M20 Or a column of Size 9"*12" Using M15
Which are the top apps for you civil engineering?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
how to calculate steel for beam of simple home and for heavy buliding ? explain me briefly
in one SQM plaster how much Cement and sand consumed in ratio 1:4
can i get placement in 2nd or 3rd year in college..
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)