I have certain queries, please help to solve. a) length of
pile bore is 4m.excavation quantity will be area * length
where area will be pi/4 * dia*dia. Is this right? b) It is
a single reamed pile of 300m dia and reamed dia is 750mm.
can any body help me to calculate excavated quantity of
this bulb(reamed section),, concrete quantity in bulb with
showing the formulas to be used?
No Answer is Posted For this Question
Be the First to Post Answer
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
Please tell me about surveying standard chain details.Thanks.
std heights of c.p fitting from ffl like health faucet,wall mixer,shower arm,european commod,wall hanging commod etc.
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
what is the method used for marking of cantilevers in hirise buildings by using theodolite
brickwork labour rate per cum ?
For M25 concrete ,what is the maximum compressive strength at 28 days ?
6 Answers L&T, Techno Builders,
What is The meaning Of Auto cad And Also Define What Is Drawing According To You
what is the formula of concrete quantity
4 Answers NKB, Soma Enterprises,
What is the use of extruded feature in solidsworks?
what are the types of roads?what are the types of highway?
Target strength = fck +(1.65*4) What is this 4
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)