we re giviang 24v supply to transmitter and we getting
output from tx?now my question is wht we call this complete
proces?

Answers were Sorted based on User's Feedback



we re giviang 24v supply to transmitter and we getting output from tx?now my question is wht we ca..

Answer / patrik

this is the process of measurement

Is This Answer Correct ?    5 Yes 1 No

we re giviang 24v supply to transmitter and we getting output from tx?now my question is wht we ca..

Answer / hiren

As output is seen from tx. It is open loop system . If tx stands for controlling application it is closed loop system.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Instrumentation Interview Questions

Explain the working principle of lvdt?

0 Answers  


what is RPI and NUT in controlnet networx. what happen if we are increase the NUT of controlnet networx?

1 Answers   Schneider,


what is modbus?and why use it?what benifit

2 Answers  


Basically iam Instruemntation Engineer, but Iam interested in Instruments design engineering, so plz guide, is there any course, training or Softwres to become Instrument design engineer??.

0 Answers   Honeywell, Tata Steel Limited,


1.what is the role of proportional comtroller in pid controller?2.How do u calibrate the control valve?

3 Answers   Bently, IOCL,






my data card only does run in my mobile so how can change it that it run other mobile & computer and i can stor data in my data card

0 Answers  


Describe the typical instrumentation used in monitoring the performance of a shell and tube heat exchanger.

0 Answers  


What are the materials use for COntrol Valve body?

1 Answers   KNPC, Qatar Petroleums,


why twisted pair of wires is used in instrumentation ?

6 Answers   ONGC,


-/5A. What is the meaning and limitations of this in energy meter constant. It is a 3 phase LT Energy Meter. If this Energy Meter is connected through a CT of ratio 200/5 Amps, then what is the multiplying constant and how its will be calculated.

0 Answers  


In closed loop control there are several “blocks” used to show the interactions between the process and the control system. These blocks are referred to as the “process” and the “controller.” Describe the relationship between these two blocks when creating a well tuned control loop.

1 Answers  


How to connect another 24 volt dc power supply in circuit when previous power supply has become weak.what is the connection?

2 Answers   Bhole Baba Dairy Industries,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)