Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How much block, cement,sand,is required for 1 sqmt of
200*200*400 block work

Answer Posted / divyesh s mistry

NUMBER OF BLOCKS REQUIRED=10 TO 12 NOS.
FOR BLOCK MASONARY WE NEED TO USE RICH CEMENT MORTAR SO THE
PREFERRABLE RATIO FOR CEMENT & SAND IS 1:4
VOLUME OF MORTAR=HORIZONTAL JOINTS
5 ROWS OF 200MM WIDE
20MM THICK MORTAR=5*.2*.02=.02CUBIC METER
VOLUME OF VERTICAL JOINTS=5*2.5*.2*.2*.02=0.01CUBIC METRE
TOTAL=.03+ADD 30% WASTAGE=.039CUBIC METRE OF CEMENT MORTAR
REQUIRED
NOW FOR PROPORTION OF 1:4

WT. OF CEMENT IN 1 SQ.MTR=.039X1X(1/5)X1440=11.232KG/SQ.MTR
VOLUME OF SAND=.039X1X(4/5)=.0312CUBIC METRE

Is This Answer Correct ?    32 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?

2523


What are the advantages of building a dam on the river nile?

1172


How much area will be covered in 1 litre of Velvet touch paint in normal wall condition

1480


what is the type of earthing

2281


how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

2518


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2173


what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?

2354


What is meant by scaffolding coefficient?

2734


I what know about life time of frp tank plz explain about it specifications & other details

2324


What is the diameter of the 3"inch nails?

2115


how to caliculate required amount of cement and sand required for 1cu.m.

2271


What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.

2635


hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard

2156


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2913


Which are the top apps for you civil engineer?

1278