Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How much block, cement,sand,is required for 1 sqmt of
200*200*400 block work

Answer Posted / divyesh s mistry

NUMBER OF BLOCKS REQUIRED=10 TO 12 NOS.
FOR BLOCK MASONARY WE NEED TO USE RICH CEMENT MORTAR SO THE
PREFERRABLE RATIO FOR CEMENT & SAND IS 1:4
VOLUME OF MORTAR=HORIZONTAL JOINTS
5 ROWS OF 200MM WIDE
20MM THICK MORTAR=5*.2*.02=.02CUBIC METER
VOLUME OF VERTICAL JOINTS=5*2.5*.2*.2*.02=0.01CUBIC METRE
TOTAL=.03+ADD 30% WASTAGE=.039CUBIC METRE OF CEMENT MORTAR
REQUIRED
NOW FOR PROPORTION OF 1:4

WT. OF CEMENT IN 1 SQ.MTR=.039X1X(1/5)X1440=11.232KG/SQ.MTR
VOLUME OF SAND=.039X1X(4/5)=.0312CUBIC METRE

Is This Answer Correct ?    32 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

which method is used in semi-rigid connection design??

2278


What is meant by cartesian coordinate system?

1165


Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?

2638


how to clculate the %of concrete strenght achive after curing?load

2429


Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting

1816


Dear Sir I Mahesh C. Bhamre have already given a Exam for Superintendent Officer / Public relation Officer Exam Dharmday Aaukta held at Nashik on Date 29/08/2010. My seat no was 5040247. and my cell no is 9822677994. and my mail Id is - mahesh.bhamre@rediffmail.com So can you pl send me details of result of respective exams. Thanking you in Anticipation.

2264


sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].

2158


For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?

1812


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

1986


Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards

2027


What are segregation and bleeding?

1191


insted of bentonite we can use any alternate material in piling ?

2164


How to estabilish reinforcement Steel rolling margin for a building projects ?

4176


What is aggregate?

1131


Why we provide hair pin for shed

2365