granite tiles laying 60/sq ft.how to convert in sq mt,what
is the mltiplying value.
Answer Posted / divyesh s mistry
1 sq.metre=10.76sq.ft
so square metre of 60 sq.ft=60/10.76=5.57sq.mtr
Is This Answer Correct ? | 14 Yes | 3 No |
Post New Answer View All Answers
What is the zero value in quantity surveying
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
How much cum. Brick work can do by 1 madon
How many pyramid in egypt?
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
what is the breaking strength of wall tiles
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.
How to calculate chejja reinforcement
Soil bearing capacity formula
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6