Answer / jigs_eee
We have an automatic power factor controller installed and have six capacitors to control the power factor. the controller is switching on & off the capacitor in auto mode to control the power factor but when we monitor pf at the electricity board meter it is low i.e between 0.8 to 0.87 & @ controller it was unity. is it possible if the load is low?
Is This Answer Correct ? | 3 Yes | 0 No |
new 90kw motor installed so how I purchased cable ,fuse,etc please give me technic for cable selected why always capacitor delta connection
how to calculate the current carrying capacity of a conductor. How it is related to diameter of cable or conductor
what is scan time of PLC & in which factor scan time is decide
What is the difference between shortcircuit current, rated current of cable & MCB with example? What will be the size of cable required for 5.5 KW motor (Full load current 10 Amps approx.), Starting current with DOL is 120 Amps. Aprrox. Short circuit current with LLLG fault is 2000 Amps Approx.
How will you explain transformer action in case of 3-phase induction motor?
Draw torque - speed curve and load curve of induction motor? mark operating point ?
why does fans rotate in anticlockwise direction?
kindly tell me how the load on generator increase by just increasing the fuel of prime mover, as if for exampple 20 MW gen set is synchronized the load ramps from zero to 20 MW gradully and during this procress only fuel of prime mover increases. Which thing determines the load on generator with respect to fuel
1.main parts of generator? what is used A-check,B-check,C- check? 2.what is FM200 system in data centers? 3.difference between pac,ahu?
what happen if we give square wave instead of sine wave to the transformer
There is 3phase power cable from 1 point to the other point which is 100m away. Two point equipped with power meter and recorded 1st point is 205kW while the 2nd is 202kW and each phase average carry 400amps. To calculate the resistance of the 3phase power cable, is the formula using will be P=I2R?
operation of protection relay watchdog contact?