Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


in control valve is constructed as per API 6D or API 6A,
then which standard is used for fire testing of valve?.



in control valve is constructed as per API 6D or API 6A, then which standard is used for fire test..

Answer / mahesh

If Control valve is constructed as per API 6D pr API 6A then fire testing of valve shall be as per the ISO 10497 or API 607

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Instrumentation Interview Questions

if we put any thermocouple on a table in a room without any connection,what temperature should it show.

3 Answers  


Sir, I want junior executive, Instrumentation question papaer for IOCL, Plz send to arabinda.ghosh83@gmail.com

0 Answers   IOCL,


What is hp & mp seperator .& what is its working principle ?

0 Answers  


why does a transmitter o/o signal starts from 3-15psi or 4- 20mA?

11 Answers  


what is pt100 RTD, and does 100 stands for

8 Answers   Tata Power,


who's take first position in process in the timing of new installation flow transmitter and control vavle. give the answer with logical trick.

2 Answers  


I installed the smartplant instrument v8, but can not be opened, that always said: "INTools 2007 hardlock no found". So Could you help me how to do for that?

0 Answers   SRAAC,


HOW WE ARE DECIDING WHILE PROGRAMMING IN PID CONTROLLER THAT WE ARE USING HEATING OR COOLING???????

1 Answers   Eskom,


I am working in a process industry, in that there are several sections devided in the SCADA screens and individual sections may START independently. But sometimes i am facing problem i.e, if section 2 Stopped by the operator immediately Section 1 or Section 3 or Section 4 is getting stopped can you expain the reason behind this?

5 Answers  


whatis range of marcury filled tempereture gague

0 Answers   Dr Reddys,


TEMPERATURE VARIATION FOR FREQUENTLY.

0 Answers   TVS,


how to trim the pressure transmitter ?

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)