Which of the following is the MOST critical and contributes
the MOST to the quality of data in a data warehouse?
A. Accuracy of the source data
B. Credibility of the data source
C. Accuracy of the extraction process
D. Accuracy of the data transformation
Answer / guest
Answer: A
Accuracy of source data is a prerequisite for the quality of
the data in a data warehouse. Credibility of the data source
is important, accurate extraction processes are important
and accurate transformation routines are important but would
not change inaccurate data into quality (accurate) data.
Is This Answer Correct ? | 6 Yes | 0 No |
An organization is experiencing a growing backlog of undeveloped applications. As part of a plan to eliminate this backlog, end-user computing with prototyping, supported by the acquisition of an interactive application generator system is being introduced. Which of the following areas is MOST critical to the ultimate success of this venture? A. Data control B. Systems analysis C. Systems programming D. Application programming
An IS auditor doing penetration testing during an audit of Internet connections would: A. evaluate configurations. B. examine security settings. C. ensure virus-scanning software is in use. D. use tools and techniques that are available to a hacker.
Electronic signatures can prevent messages from being: A. suppressed. B. repudiated. C. disclosed. D. copied.
After installing a network, an organization installed a vulnerability assessment tool or security scanner to identify possible weaknesses. Which is the MOST serious risk associated with such tools? A. Differential reporting B. False positive reporting C. False negative reporting D. Less detail reporting
Which of the following is an implementation risk within the process of decision support systems? A. Management control B. Semistructured dimensions C. Inability to specify purpose and usage patterns D. Changes in decision processes
Which of these has the potential to improve security incident response processes? A. Review the incident response procedures. B. Post-mortem or post-event reviews by the security team. C. Getting the hot-site ready. D. Reviw the BCP plan every six months
While planning an audit, an assessment of risk should be made to provide: A. reasonable assurance that the audit will cover material items. B. definite assurance that material items will be covered during the audit work. C. reasonable assurance that all items will be covered by the audit. D. sufficient assurance that all items will be covered during the audit work.
The rate of change of technology increases the importance of: A. outsourcing the IS function. B. implementing and enforcing good processes. C. hiring personnel willing to make a career within the organization. D. meeting user requirements.
Which of the following fire suppressant systems would an IS auditor expect to find when conducting an audit of an unmanned computer center? A. Carbon dioxide B. Halon C. Dry-pipe sprinkler D. Wet-pipe sprinkler
After implementation of a disaster recovery plan (DRP), pre-disaster and post-disaster operational cost for an organization will: A. decrease. B. not change (remain the same). C. increase. D. increase or decrease depending upon nature of the business.
A data center has a badge-entry system. Which of the following is MOSTimportant to protect the computing assets in the center? A. Badge readers are installed in locations where tampering would be noticed B. The computer that controls the badge system is backed up frequently C. A process for promptly deactivating lost or stolen badges exists D. All badge entry attempts are logged
An advantage in using a bottom-up versus a top-down approach to software testing is that: A. interface errors are detected earlier. B. confidence in the system is achieved earlier. C. errors in critical modules are detected earlier. D. major functions and processing are tested earlier.