Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


After implementation of a disaster recovery plan (DRP),
pre-disaster and post-disaster operational cost for an
organization will:

A. decrease.

B. not change (remain the same).

C. increase.

D. increase or decrease depending upon nature of the business.



After implementation of a disaster recovery plan (DRP), pre-disaster and post-disaster operational ..

Answer / guest

Answer: C

There are costs associated with all activities and DRP is
not an exception. Although there are costs associated with a
DRP there are unknown costs that would be incurred if a DRP
were not implemented.

Is This Answer Correct ?    9 Yes 2 No

Post New Answer

More CISA Certification Interview Questions

Which of the following is a measure of the size of an information system based on the number and complexity of a system?s inputs, outputs and files? A. Function point (FP) B. Program evaluation review technique (PERT) C. Rapid application design (RAD) D. Critical path method (CPM)

2 Answers  


An IS auditor is assigned to perform a post implementation review of an application system. Which of the following situations may have impaired the independence of the IS auditor? The IS auditor: A. implemented a specific control during the development of the application system. B. designed an embedded audit module exclusively for auditing the application system. C. participated as a member of the application system project team, but did not have operational responsibilities. D.provided consulting advice concerning application system best practices.

2 Answers  


The phases and deliverables of a systems development life cycle (SDLC) project should be determined: A. during the initial planning stages of the project. B. after early planning has been completed, but before work has begun. C. through out the work stages based on risks and exposures. D. only after all risks and exposures have been identified and the IS auditor has recommended appropriate controls.

2 Answers  


Which of the following is widely accepted as one of the critical components in networking management? A. Configuration management B. Topological mappings C. Application of monitoring tools D. Proxy server trouble shooting

1 Answers  


In a risk-based audit approach an IS auditor should FIRST complete a/an: A. inherent risk assessment. B. control risk assessment. C. test of control assessment. D. substantive test assessment.

1 Answers  


A hardware control that helps to detect errors when data are communicated from one computer to another is known as a: A. duplicate check. B. table lookup. C. validity check. D. parity check.

2 Answers  


Which of the following types of controls is designed to provide the ability to verify data and record values through the stages of application processing? A. Range checks B. Run-to-run totals C. Limit checks on calculated amounts D. Exception reports

3 Answers  


A call-back system requires that a user with an id and password call a remote server through a dial-up line, then the server disconnects and: A. dials back to the user machine based on the user id and password using a telephone number from its database. B. dials back to the user machine based on the user id and password using a telephone number provided by the user during this connection. C. waits for a redial back from the user machine for reconfirmation and then verifies the user id and password using its database. D. waits for a redial back from the user machine for reconfirmation and then verifies the user id and password using the sender's database.

1 Answers  


Which of the following controls would be MOST effective in ensuring that production source code and object code are synchronized? A. Release-to-release source and object comparison reports B. Library control software restricting changes to source code C. Restricted access to source code and object code D. Date and time-stamp reviews of source and object code

2 Answers  


Which of the following is a practice that should be incorporated into the plan for testing disaster recovery procedures? A. Invite client participation. B. Involve all technical staff. C. Rotate recovery managers. D. Install locally stored backup.

4 Answers   Microsoft,


Which of the following reports should an IS auditor use to check compliance with a service level agreement (SLA) requirement for uptime? A. Utilization reports B. Hardware error reports C. System logs D. Availability reports

2 Answers  


Which of the following is MOST likely to result from a business process reengineering (BPR) project? A. An increased number of people using technology B. Significant cost savings, through a reduction in the complexity of information technology C. A weaker organizational structures and less accountability D. Increased information protection (IP) risk will increase

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)