Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is droop control?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Electrical Engineering Interview Questions

when the time of backcharging the transformer three phases only enough or three phase with neutral is must.from these which one is the best one.

0 Answers  


Can anybody just suggest about the scope of Electrical design with ETAP software?Just guide me?

0 Answers  


why voltage coil in wattmeter called as pressure coil why the pressure term is used in wattmeter?

1 Answers   NPCIL,


what is the difference betwteen overcurrent and short circuit fault?

3 Answers  


Distribution transformer we provided 2 separate earthing pit for Body and 2 separate earthing pit for neutral,we can not connect separate body earthing pit to other earthing pit but we do metal glanding in secondary side cable termination in both side, transformer and PCC panel (LT Panel), is this safe for transformer and other equipment?

0 Answers  


what is iron loss?

4 Answers   RRB,


how tto ingress mw in turbine explain.procedure ?

0 Answers   Power Grid,


I have 440v power coming to facility,( not being used ) can I buy large generator, (gas) to sell power back to electrical co.

0 Answers   KVF,


how will you calculate rated Primary and Secondary voltage and Current for 2500 KVA, 11kv/443V Transformer

2 Answers  


i am iti student i have project to do. that IS 100MW 220\33KV SUBSTATION I WANT TO KNOW HOW TO START, LIKE CALCULATION, WHAT RATING OF CT,CVT, PT, ISOLATOR LIGHTING ARRESTER WAVE TRAP CIRCUIT BREAKER IN 22OKV SIDE, ALSO TO WARDS 33KV SIDE PLS HELP ME WITH THIS, THIS MY LIFE NOW, I KNOW AUTOCAD, I LIKE TO KNOW HOW TO CALCULATE ALL THE THINGS

3 Answers  


WHat is the requirement of installing FAST ACTING EARTH SWITCH in GIS and how is that integrated with protection system. How and when does it operate?

0 Answers  


can the measured percentage error during calibration of single phase energy meter be negative?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)