what is the design procedure for building
No Answer is Posted For this Question
Be the First to Post Answer
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
what is workmanship.
what is gunter's chainm. what is yhe number of links in chain. and 1 link shows what distance
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
While painting,if the gypsum is the first coat to seal holes on wall,It said to have tendency get away with all other coat. What is the solution on that?
what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?
12 Answers HPCL, Shrestha Civil Engineering Construction Company Pvt. Ltd, Sri Avani Projects, Tata Projects,
1)define the critical items in rcc framed G+18 bldg. as Cr Activity 1,Cr Activity 2,Cr Activity 3...etc. 2)on what logic is MSP and Primavera planning based.FS SF FF...
Why should you show Client/Engineer activities clearly on the project plan?
How to calculate stirrups cutting length in columns
Difference between pre-tensioning and post-tensioning.
what is SDLC ?and write a 'c'program for to swapping the three numbers?
What is the factor of safety in civil engineering