where do you see urself after 5 years?
Answers were Sorted based on User's Feedback
Answer / ali
To be a Good Team Member,Following all da instructions given
by da leader or Team leader r Manager
Is This Answer Correct ? | 3 Yes | 3 No |
Answer / unnati gaglanni
WELL,...... FIRST OF ALL I WILL BE SATISIFIED JUST BECAUSE
I GOT JOB IN THIS MUTLINATIONAL COMPANY AND I JUST WANT TO
GO AHED N WANT FULLFILL MY TASK HAPPILY, SO I WILL GET
SUCCESS IN MY WAY,..............
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / mitali21
i see myself HAPPY n SATISFIED first of all and working in
a big multinational company.
Is This Answer Correct ? | 5 Yes | 6 No |
Answer / sudheer reddy
i see myself ,in a big chair like a enterpriner.
i will provide job s for some people
Is This Answer Correct ? | 1 Yes | 6 No |
what are the basic difference between India and China? Why both the countries are attractive the attention of foreign investor?
Hi brief the following. 1) How would we can fix the exact machinery for the excavation at construction site. 2)what is mean by 43/ 53 grades in cement? 3) what is the diff between fe 415 / fe500 and what is the usage of two grades. 4)how we can check the exact weight of one truck load of TMT rods. 5) what is the percentage of tolerance of TMT rod while receipt at site. 6) how we can test and evaluate the grade and quality of timber while receiving at construction site. 7) how we can select the right plywood for shuttering 8)what are the diff grade of RMc and how we can select the right RMC for the specific work 9)what is the ratio for binding wire for 1 ton of tmt 10) how we can select the quality bricks. what are check measures. 11) how we can select and procure the river sand for construction purpose. 12) how we can recon the store materials with actual purchased at construction site. 13) what are the documents required to transfer our own material from one site to another site between two states. 14) what are the different types of formworks and its usages 15) what are the diff types scaffolding materails and its usage 16)how we can select the right tiles for flooring, wall and other areas. 17)what are the diff types of tiles and its usages 18)what is the procedure to select the tiles for construction 19) what is the calculation method for no of tiles received at site 20)what is the common procedure to codify store and scaffolding materials at construction 21)how we can select the right granite/ marble / kota stone for the specif usage at site. 22) what are the basic items for site mobilization 23) what are the step by step construction process. 24) how we can select the right timber for doors at site.
Explain the Human Behaviour Approach to management.
state the importance of fixed maximum fiduciary system
Depresation Rates as per Income Tax Law ?
kindly tell me what does it mean if bank official make me call and ask me that in case u get selected in icici bank then what would u do?
In Sales order the order quantity is 10 but 6 is billed the status is shown as being processed after that i changed the order quantity to 6 and saved then status showed completed but now i had change the quantity to 10 now the status is changed to being processed ,the question is now the 4 number quantity has to bill and now if the stock is there and whether the 4 numbers will be picked or not picked by the order?
What qualities should a successful manager possess?
difference between association and group?
What is statment?
what do you mean by Procurement?
what is the difference between bussiness development and bussiness system analyst?