how many no of light weight solid blocks of size 600x200x200mm
required for 1cum of block work
Answers were Sorted based on User's Feedback
Answer / amit
first of all mortar quantity has to be calculated.
it comes b/w 15% to 17.5% of total block work.that means 0.15 cubicmeter to 0.175cum.therefore
Actual quantity of Blocks required=1-0.15=0.85cum
hence Nos of blocks=0.85/(0.6x0.2x0.2)=36 blocks
2 to 3% wastege= 1 blocks
thus total quantity=36+1=37 blocks
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / v nagarur
1cubic meter/volume of cube gives us number of bricks,so, for,
600*200*200
1/0.6*0.2*0.2=41.66=42bricks
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / amit
after considering mortar quantity & wastage=40 blocks
| Is This Answer Correct ? | 0 Yes | 1 No |
why there is no concrete mix of ratio 1:.5:1
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
0 Answers Bhugan Infracon, UltraTech,
how to calculate the quantaty of steel in footing please show me detail procedure with the help of drawing
What is meant by engineering drawing?
List out the types of roofs?
How many square meter can mason layout chb per hour
what is the weight of wet concrete?
castigliano's theorems are based on
What is the difference between single reinforcement
What Is the meaning of M15 and M20
What is type failure of road surface? how to repair the failure of road surface?
what is the bearing capacity of hard rock
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)