how many no of light weight solid blocks of size 600x200x200mm
required for 1cum of block work

Answers were Sorted based on User's Feedback



how many no of light weight solid blocks of size 600x200x200mm required for 1cum of block work ..

Answer / pranav mudaliyar

42 nos.

Is This Answer Correct ?    6 Yes 0 No

how many no of light weight solid blocks of size 600x200x200mm required for 1cum of block work ..

Answer / amit

first of all mortar quantity has to be calculated.
it comes b/w 15% to 17.5% of total block work.that means 0.15 cubicmeter to 0.175cum.therefore
Actual quantity of Blocks required=1-0.15=0.85cum
hence Nos of blocks=0.85/(0.6x0.2x0.2)=36 blocks
2 to 3% wastege= 1 blocks
thus total quantity=36+1=37 blocks

Is This Answer Correct ?    1 Yes 1 No

how many no of light weight solid blocks of size 600x200x200mm required for 1cum of block work ..

Answer / v nagarur

1cubic meter/volume of cube gives us number of bricks,so, for,
600*200*200

1/0.6*0.2*0.2=41.66=42bricks

Is This Answer Correct ?    1 Yes 2 No

how many no of light weight solid blocks of size 600x200x200mm required for 1cum of block work ..

Answer / amit

after considering mortar quantity & wastage=40 blocks

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

How to convert sqft in cft

11 Answers   BEL,


how can we calculate cutting length of a column ring (300 x 600)

16 Answers   AVL, Manchanda, Vardhman,


how to calculate reinforcment in staircase cranked beam?

0 Answers   DLF,


strenth of brick

7 Answers  


sir please send me campus placement questions in civil engineering

0 Answers   Gammon,






what is a steel formula

13 Answers  


Cement proportion in Fly ash bricks and type of cement to be used ?

2 Answers  


In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?

0 Answers  


How many cum of 9.5mm stone in 1 ton ?

0 Answers   GT Realty,


Sir please Bhel Enigineer trainy test papaers in civil engineering

1 Answers   Bhel,


a revised estimate is prepared when the original estimate has exceed by more than 1 percent 2 10 18.40

2 Answers  


Soil Mechanic: You are building a gravel road. How much water do you need to mix in compact 100 m3 of road quantity borrow pit gravel?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)