why primer application is required before applying putty
Answers were Sorted based on User's Feedback
Answer / kumars
THE ABOVE ANSWER ARE OK. PUTTY WE ARE APPLYING MIX WITH PUTTY POWER & LEQUIDENT LIKE WATER OR WATER BASE, IF WE ARE APLLYING TO DIRCTLY TO PLASTED SURFACE IT WILL ABSORB THE WATER CONTENT IN PUTTY ,THEN WE CAN'T GET SMOOTH FINISH IT WILL LIKE A DRY POWDER, SO FOR THAT REASON WE ARE APLLYING PRIMER AS BASE COAT BEFORE APLLYING PUTTY.
BY KUMAR
Is This Answer Correct ? | 11 Yes | 2 No |
Which are the Steel tests ?
How many solid blocks can build one mason per 8 hours?
What are the techniques to measure road difference?
what will happen if we use milk or oil in the place of water in concrete??????????
1M2=how much M3?
how many kilograms of binding wire in 1 kilograms of steel bars
How much used for sand per square meter in 12mm Thickness
What is differences between torsion and buckling?
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
why we do multiply 1.54 for dry volume of concrete?
What do you mean by bond? What are the different types of bonds?
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????