EHV current carrying parts need to have smooth finish,then
how can a 245kv GIS with emery finish can run so long?
No Answer is Posted For this Question
Be the First to Post Answer
(1)For 3 No 1500 KVA transformer require on one single bus bar or need to be section through bus coupler means upto 3MVA.(2) 22KV Net work system as ring, How maney I/C required or 0ne I/C and one O/G.(3) What should be rating of VCB for 22 KV line.(4)Electrical/mechanical inter lock, why we need.
Corona occurs between two transmission wires when they (a) are closely-spaced (b) are widely-spaced (c) have high potential difference (d) carry d.c. power
why a bulb glow when connected with two end phase and neutral respectively.
oil cooled transformer
What is the purpose of shunt trip in ACB function?
what happen if the secondry winding of the transformer is having less no of turns compare to the primery winding.
derive the formula of amp hours is calculated for 12v battery.where no. of plates is given
what is the best electrical system i.e substation sytem of 11kv/.433kv for a township. if township have 300nos substation of 11kv. we have to go G.O.D.O. fuse unit or Compact Substation Unit. please reply Asap.
how to synchronize 4 nos. of diesel generator sets of different capacity (kva)?
what size of copper busbar use for 11kv 630A
use of choke in APFC panels
why -48 volts dc used in telecommucation
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)